Skip to main content
R
NeighborhoodReport

Railroad St

Thomson, GA 30824
4
Homes
1
Streets

Address Directory

1 126 Railroad St

Owner: Cain A M Bickley LLC Po Box 91

2 217 Railroad St

Owner: St James Cme Church

3 322 Railroad St

Owner: City Of Montezuma
Nonprofit

4 402 Railroad St

Owner: City Of Montezuma

Source: County assessor records, public records & state business filings · Updated Feb 2026

Loading map...

Explore Nearby in Thomson

Discover other neighborhoods in Thomson, GA and compare what they have to offer.

Federal Grants & Assistance

USAspending.gov grant awards to recipients in this neighborhood.

4 grant records found FY2024–2025
Mcduffie County Board Of Commisioners
210 Railroad St
Environmental Protection Agency
CONGRESSIONALLY MANDATED PROJECTS
DESCRIPTION:THIS ACTION PROVIDES FUNDING IN THE AMOUNT OF $1,100,000 TO MCDUFFIE COUNTY BOARD OF COMMISSIONERS TO IMPLEMENT ITS PROJECT TO REHABILITATE THEIR SEWER SYSTEM AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE PROJECT. WORKPLAN ACTIVITIES CONSIST OF INSTALLING SEWER LINES AND REPLACING SEPTIC SYSTEMS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE CONSTRUCTING APPROXIMATELY 5,300 LINEAR FEET OF 8' GRAVITY SEWER LINES UP TO 47 HOMES, INSTALLING LATERALS AND REPLACING THE SEPTIC SYSTEMS. EXPECTED OUTCOMES INCLUDE BETTER WASTEWATER SERVICE FOR THE IMPACTED COMMUNITY. INTENDED BENEFICIARIES INCLUDE RESIDENTS OF THE MCDUFFIE COUNTY, GEORGIA.
$1,100,000
COOPERATIVE AGREEMENT (B)
Jun 16, 2025
City Of Thomson
210 Railroad St
Environmental Protection Agency
CONGRESSIONALLY MANDATED PROJECTS
DESCRIPTION:THIS ACTION APPROVES FUNDING IN THE AMOUNT OF $125,000 TO THE CITY OF THOMSON, GEORGIA TO FUND ITS FIRST AVENUE STORM WATER IMPROVEMENTS PROJECT TO DIVERT STORM WATER FROM THE STREET AND OVERFLOWING STORM WATER PIPES TO AN UNDERGROUND STORM WATER DETENTION VAULT THAT CAPTURES RUNOFF AND RELEASES IT SLOWLY OVER TIME TO PREVENT THE BUILD-UP AND SUBSEQUENT FLOODING OF RAINWATER INTO THE STREET AND BASEMENTS OF NEARBY STRUCTURES (RESIDENTIAL AND COMMERCIAL) AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: PHASE 1. DESIGN DRAINAGE INFRASTRUCTURE TO ADDRESS AGING AND FAILED INFRASTRUCTURE AND ALLEVIATE FLOODING. FUNDS REQUESTED NOW ARE ONLY FOR ENGINEERING AND DESIGN.: A) PROCUREMENT FOR ENGINEERING DESIGN AND CONSTRUCTION OVERSIGHT SERVICES; B) SURVEYING, GEOTECHNICAL TESTING, AND TRAFFIC STUDIES IF NEEDED; C) DRAINAGE EASEMENT AND/OR RIGHT-OF-WAY INVESTIGATION, PROPERTY RESEARCH, APPRAISAL AND NEGOTIATIONS; D) EVALUATIONS, ANALYSIS, REPORTS, RECOMMENDATIONS, COST AND TIME ESTIMATES; E) DESIGN, PREPARATION OF CONTRACT AND/OR RECORD DOCUMENTS; F) ALL PHASES OF PERMITTING INCLUDING BUT NOT LIMITED TO THE STATE REVIEW ENVIRONMENTAL PROCESS (SERP); G) CONSTRUCTION ADMINISTRATION; H) PROFESSIONAL MANAGEMENT THROUGHOUT ALL PHASES OF THE PROJECT INCLUDING BUT NOT LIMITED TO, PERIODIC PROGRESS REPORTS/MEETINGS, PROPER PROCESSING OF INVOICES FOR SERVICES, TIMELY PROCESSING OF PROJECT CORRESPONDENCE, FIELD INSPECTIONS AND INVESTIGATION. PHASE 2 OF THE PROJECT WILL NOT BEGIN UNTIL AFTER DOCUMENTATION AND INFORMATION FROM PHASE 1 IS RECEIVED BY EPA FOR REVIEW AND APPROVAL.SUBRECIPIENT:THE SUBAWARD OF $40,000 WILL BE PROVIDED TO THE CENTRAL SAVANNAH RIVER AREA REGIONAL COMMISSION (CSRA RC) FOR THE TECHNICAL ASSISTANCE. OUTCOMES:THE ANTICIPATED OUTCOMES ARE: 1) SIGNED AND SEALED DESIGN DRAWINGS FOR DRAINAGE INFRASTRUCTURE IMPROVEMENTS TO ADDRESS FAILED INFRASTRUCTURE AND ALLEVIATE FLOODING; 2) A COMPLETED DRAINAGE INFRASTRUCTURE CONSTRUCTION TO ADDRESS FAILED INFRASTRUCTURE AND ALLEVIATE FLOODING. THESE DELIVERABLES ARE EXPECTED TO LEAD TO 1) THE CREATION OF TWO NEW STORM WATER DETENTION PONDS WITHIN A 1.8-ACRE AREA; 2) THE REPLACEMENT OF STORM WATER PIPES AND INFRASTRUCTURE AND INSTALL ADDITIONAL STORM GRATES; 3) THE INSTALLATION OF STORM WATER INFRASTRUCTURE FOR THE RESIDENTIAL AND COMMERCIAL SERVICE AREA IN DOWNTOWN THOMSON. THE PROJECT SERVICE AREA, DOWNTOWN THOMSON, IS LACKING RESILIENCY FROM FLOODING DUE TO AGING AND FAILED STORMWATER INFRASTRUCTURE. THE PROJECT WILL IMPROVE DRAINAGE FOR THE SERVICE AREA, THEREBY REDUCING IMPACTS FROM CLIMATE CHANGE-RELATED FLOODING AS WELL AS PROVIDING CRITICAL STORMWATER INFRASTRUCTURE REDUCING FLOODING AND INCREASING THE RESILIENCE OF THE COMMUNITY. DELIVERABLES INCLUDE SEMI-ANNUAL AND FINAL REPORTS. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS IN CITY OF THOMSON AND STATE OF GEORGIA.
$965,000
COOPERATIVE AGREEMENT (B)
Jul 28, 2025
City Of Thomson
210 Railroad St
Environmental Protection Agency
CONGRESSIONALLY MANDATED PROJECTS
DESCRIPTION:THIS ACTION APPROVES FUNDING IN THE AMOUNT OF $120,000 TO THE CITY OF THOMSON, GEORGIA TO FUND ITS FIRST AVENUE STORM WATER IMPROVEMENTS PROJECT TO DIVERT STORM WATER FROM THE STREET AND OVERFLOWING STORM WATER PIPES TO AN UNDERGROUND STORM WATER DETENTION VAULT THAT CAPTURES RUNOFF AND RELEASES IT SLOWLY OVER TIME TO PREVENT THE BUILD-UP AND SUBSEQUENT FLOODING OF RAINWATER INTO THE STREET AND BASEMENTS OF NEARBY STRUCTURES (RESIDENTIAL AND COMMERCIAL) AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: PHASE 1. DESIGN DRAINAGE INFRASTRUCTURE TO ADDRESS AGING AND FAILED INFRASTRUCTURE AND ALLEVIATE FLOODING. FUNDS REQUESTED NOW ARE ONLY FOR ENGINEERING AND DESIGN.: A) PROCUREMENT FOR ENGINEERING DESIGN AND CONSTRUCTION OVERSIGHT SERVICES; B) SURVEYING, GEOTECHNICAL TESTING, AND TRAFFIC STUDIES IF NEEDED; C) DRAINAGE EASEMENT AND/OR RIGHT-OF-WAY INVESTIGATION, PROPERTY RESEARCH, APPRAISAL AND NEGOTIATIONS; D) EVALUATIONS, ANALYSIS, REPORTS, RECOMMENDATIONS, COST AND TIME ESTIMATES; E) DESIGN, PREPARATION OF CONTRACT AND/OR RECORD DOCUMENTS; F) ALL PHASES OF PERMITTING INCLUDING BUT NOT LIMITED TO THE STATE REVIEW ENVIRONMENTAL PROCESS (SERP); G) CONSTRUCTION ADMINISTRATION; H) PROFESSIONAL MANAGEMENT THROUGHOUT ALL PHASES OF THE PROJECT INCLUDING BUT NOT LIMITED TO, PERIODIC PROGRESS REPORTS/MEETINGS, PROPER PROCESSING OF INVOICES FOR SERVICES, TIMELY PROCESSING OF PROJECT CORRESPONDENCE, FIELD INSPECTIONS AND INVESTIGATION. PHASE 2 OF THE PROJECT WILL NOT BEGIN UNTIL AFTER DOCUMENTATION AND INFORMATION FROM PHASE 1 IS RECEIVED BY EPA FOR REVIEW AND APPROVAL.SUBRECIPIENT:THE SUBAWARD OF $40,000 WILL BE PROVIDED TO THE CENTRAL SAVANNAH RIVER AREA REGIONAL COMMISSION (CSRA RC) FOR THE TECHNICAL ASSISTANCE. OUTCOMES:THE ANTICIPATED OUTCOMES ARE: 1) SIGNED AND SEALED DESIGN DRAWINGS FOR DRAINAGE INFRASTRUCTURE IMPROVEMENTS TO ADDRESS FAILED INFRASTRUCTURE AND ALLEVIATE FLOODING; 2) A COMPLETED DRAINAGE INFRASTRUCTURE CONSTRUCTION TO ADDRESS FAILED INFRASTRUCTURE AND ALLEVIATE FLOODING. THESE DELIVERABLES ARE EXPECTED TO LEAD TO 1) THE CREATION OF TWO NEW STORM WATER DETENTION PONDS WITHIN A 1.8-ACRE AREA; 2) THE REPLACEMENT OF STORM WATER PIPES AND INFRASTRUCTURE AND INSTALL ADDITIONAL STORM GRATES; 3) THE INSTALLATION OF STORM WATER INFRASTRUCTURE FOR THE RESIDENTIAL AND COMMERCIAL SERVICE AREA IN DOWNTOWN THOMSON. THE PROJECT SERVICE AREA, DOWNTOWN THOMSON, IS LACKING RESILIENCY FROM FLOODING DUE TO AGING AND FAILED STORMWATER INFRASTRUCTURE. THE PROJECT WILL IMPROVE DRAINAGE FOR THE SERVICE AREA, THEREBY REDUCING IMPACTS FROM CLIMATE CHANGE-RELATED FLOODING AS WELL AS PROVIDING CRITICAL STORMWATER INFRASTRUCTURE REDUCING FLOODING AND INCREASING THE RESILIENCE OF THE COMMUNITY. DELIVERABLES INCLUDE SEMI-ANNUAL AND FINAL REPORTS. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS IN CITY OF THOMSON AND STATE OF GEORGIA.
$965,000
COOPERATIVE AGREEMENT (B)
Mar 19, 2024
City Of Thomson
210 Railroad St
Environmental Protection Agency
CONGRESSIONALLY MANDATED PROJECTS
DESCRIPTION:THIS ACTION APPROVES FUNDING IN THE AMOUNT OF $120,000 TO THE CITY OF THOMSON, GEORGIA TO FUND ITS FIRST AVENUE STORM WATER IMPROVEMENTS PROJECT TO DIVERT STORM WATER FROM THE STREET AND OVERFLOWING STORM WATER PIPES TO AN UNDERGROUND STORM WATER DETENTION VAULT THAT CAPTURES RUNOFF AND RELEASES IT SLOWLY OVER TIME TO PREVENT THE BUILD-UP AND SUBSEQUENT FLOODING OF RAINWATER INTO THE STREET AND BASEMENTS OF NEARBY STRUCTURES (RESIDENTIAL AND COMMERCIAL) AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: PHASE 1. DESIGN DRAINAGE INFRASTRUCTURE TO ADDRESS AGING AND FAILED INFRASTRUCTURE AND ALLEVIATE FLOODING. FUNDS REQUESTED NOW ARE ONLY FOR ENGINEERING AND DESIGN.: A) PROCUREMENT FOR ENGINEERING DESIGN AND CONSTRUCTION OVERSIGHT SERVICES; B) SURVEYING, GEOTECHNICAL TESTING, AND TRAFFIC STUDIES IF NEEDED; C) DRAINAGE EASEMENT AND/OR RIGHT-OF-WAY INVESTIGATION, PROPERTY RESEARCH, APPRAISAL AND NEGOTIATIONS; D) EVALUATIONS, ANALYSIS, REPORTS, RECOMMENDATIONS, COST AND TIME ESTIMATES; E) DESIGN, PREPARATION OF CONTRACT AND/OR RECORD DOCUMENTS; F) ALL PHASES OF PERMITTING INCLUDING BUT NOT LIMITED TO THE STATE REVIEW ENVIRONMENTAL PROCESS (SERP); G) CONSTRUCTION ADMINISTRATION; H) PROFESSIONAL MANAGEMENT THROUGHOUT ALL PHASES OF THE PROJECT INCLUDING BUT NOT LIMITED TO, PERIODIC PROGRESS REPORTS/MEETINGS, PROPER PROCESSING OF INVOICES FOR SERVICES, TIMELY PROCESSING OF PROJECT CORRESPONDENCE, FIELD INSPECTIONS AND INVESTIGATION. PHASE 2 OF THE PROJECT WILL NOT BEGIN UNTIL AFTER DOCUMENTATION AND INFORMATION FROM PHASE 1 IS RECEIVED BY EPA FOR REVIEW AND APPROVAL.SUBRECIPIENT:THE SUBAWARD OF $40,000 WILL BE PROVIDED TO THE CENTRAL SAVANNAH RIVER AREA REGIONAL COMMISSION (CSRA RC) FOR THE TECHNICAL ASSISTANCE. OUTCOMES:THE ANTICIPATED OUTCOMES ARE: 1) SIGNED AND SEALED DESIGN DRAWINGS FOR DRAINAGE INFRASTRUCTURE IMPROVEMENTS TO ADDRESS FAILED INFRASTRUCTURE AND ALLEVIATE FLOODING; 2) A COMPLETED DRAINAGE INFRASTRUCTURE CONSTRUCTION TO ADDRESS FAILED INFRASTRUCTURE AND ALLEVIATE FLOODING. THESE DELIVERABLES ARE EXPECTED TO LEAD TO 1) THE CREATION OF TWO NEW STORM WATER DETENTION PONDS WITHIN A 1.8-ACRE AREA; 2) THE REPLACEMENT OF STORM WATER PIPES AND INFRASTRUCTURE AND INSTALL ADDITIONAL STORM GRATES; 3) THE INSTALLATION OF STORM WATER INFRASTRUCTURE FOR THE RESIDENTIAL AND COMMERCIAL SERVICE AREA IN DOWNTOWN THOMSON. THE PROJECT SERVICE AREA, DOWNTOWN THOMSON, IS LACKING RESILIENCY FROM FLOODING DUE TO AGING AND FAILED STORMWATER INFRASTRUCTURE. THE PROJECT WILL IMPROVE DRAINAGE FOR THE SERVICE AREA, THEREBY REDUCING IMPACTS FROM CLIMATE CHANGE-RELATED FLOODING AS WELL AS PROVIDING CRITICAL STORMWATER INFRASTRUCTURE REDUCING FLOODING AND INCREASING THE RESILIENCE OF THE COMMUNITY. DELIVERABLES INCLUDE SEMI-ANNUAL AND FINAL REPORTS. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS IN CITY OF THOMSON AND STATE OF GEORGIA.
$965,000
COOPERATIVE AGREEMENT (B)
May 13, 2025

Schools & Education

Part of McDuffie County School District. 3 nearby schools serving this area.

E
Elementary

Norris Elementary School

Score 31/100
Enrollment 491
Distance 0.3 mi
M
Middle

Thomson-Mcduffie Middle School

Score 31/100
Enrollment 842
Distance 1.2 mi
H
High School

Thomson High School

Enrollment 1,226
Distance 1.3 mi

Source: National Center for Education Statistics (NCES) · Updated Feb 2026

At a Glance

Best School
31/100
3 nearby schools
Stability
Stable
55/100
4 homes · 1 street

Railroad St exhibits moderate stability with a mix of long-term and newer residents.

Continue Your Research

Frequently Asked Questions

What school district is Railroad St in?
Railroad St is served by McDuffie County School District. The highest-rated nearby school scores 31/100.
How many homes are in Railroad St?
Railroad St in Thomson, GA has 4 homes across 1 street.
Is Railroad St good for families?
Railroad St is served by McDuffie County School District (top school score: 31/100). The neighborhood has 4 homes across 1 street, providing a close-knit community for families.
What elementary school serves Railroad St?
The nearest elementary school is Norris Elementary School, located 0.3 miles away. It has 491 students enrolled.
What high school serves Railroad St?
The nearest high school is Thomson High School, located 1.3 miles away.
Is Railroad St a stable neighborhood?
Railroad St has a stability score of 55/100, classified as "Stable." This indicates moderate stability with some residential turnover.

Data Sources & Methodology

5 verified data sources power this report

Property tax & valuation records

Federal education statistics

Healthcare facility & outcome data

Transportation & hazard data

5-year community survey estimates

Last updated:

View full methodology

Get Neighborhood Updates

Stay informed about changes in Railroad St.