Main St
Savannah, GA 31408 Upscale Large Neighborhood
6
Homes
1
Streets
$504,876
Avg Home
Address Directory
1 27 Main St
Owner: Brown Terrell & Paulette
1 27 Main St
Owner: Brown Terrell & Paulette
Property Details
County
Telfair County
2 114 Main St
Owner: Clark Lucille C/O Karen C Searcy
2 114 Main St
Owner: Clark Lucille C/O Karen C Searcy
Property Details
County
Telfair County
3 150 Main St
Owner: Bowers Melvin
3 150 Main St
Owner: Bowers Melvin
Property Details
County
Telfair County
4 860 Main St
Owner: Tucker David & Teresa
4 860 Main St
Owner: Tucker David & Teresa
Property Details
County
Telfair County
5 882 Main St
Owner: Widener Randy
5 882 Main St
Owner: Widener Randy
Property Details
County
Telfair County
6 933 Main St
Owner: Abney Louise B & Frank A
6 933 Main St
Owner: Abney Louise B & Frank A
Property Details
County
Telfair County
Source: County assessor records, public records & state business filings · Updated Feb 2026
Loading map...
Explore Nearby in Savannah
Discover other neighborhoods in Savannah, GA and compare what they have to offer.
Spg St
94 homes
$59,622 avg home
Ida J Gadsden Dr
5 homes
$206,660 avg home
Adams Ave
23 homes
$93,350 avg home
Airways Ave
5 homes
$22,736,093 avg home
King St
94 homes
$86,747 avg home
13 St
20 homes
$159,842 avg home
Eli Whitney Blvd
7 homes
$2,712,122 avg home
Bourne Blvd
13 homes
$3,986,521 avg home
Federal Grants & Assistance
USAspending.gov grant awards to recipients in this neighborhood.
5 grant records found FY2024–2025
Georgia Ports Authority
2 Main Street
Environmental Protection Agency
CLEAN PORTS PROGRAM
DESCRIPTION:THIS ACTION PROVIDES FUNDING IN THE AMOUNT OF $48,763,746 TO THE GEORGIA PORTS AUTHORITY. THE FUNDING IS DESIGNATED TO SUPPORT THE ENHANCEMENT OF AIR QUALITY AND MITIGATE POLLUTION AT THE PORT OF SAVANNAH, THE PORT OF BRUNSWICK, AND THEIR SURROUNDING AREAS, AS PART OF THE INFLATION REDUCTION ACT. THIS WILL BE ACHIEVED THROUGH THE IMPLEMENTATION OF ZERO EMISSION EQUIPMENT AND INFRASTRUCTURE AT THE PORTS.ACTIVITIES:THE ACTIVITIES INCLUDE THE PURCHASE AND DEPLOYMENT OF ZERO EMISSION EQUIPMENT, TECHNOLOGIES, AND RELATED INFRASTRUCTURE, AS WELL AS WORKFORCE DEVELOPMENT.#8239;SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE THE PURCHASE AND INSTALLATION OF VESSEL SHORE POWER INFRASTRUCTURE AT FOUR LOCATIONS AND THE PURCHASE OF 16 ZERO EMISSION PORT TERMINAL TRACTORS, 18 175 KW FAST CHARGING SYSTEMS, AND THREE PAD MOUNTED TRANSFORMERS, PAD MOUNTED SWITCHGEAR, AND ADDITIONAL SWITCHGEAR. THE EXPECTED OUTCOMES INCLUDE REDUCED CARBON DIOXIDE, PARTICULATE MATTER 2.5, SULFUR OXIDES, HYDROCARBONS, CARBON MONOXIDE, AND NITROGEN OXIDE EMISSIONS, DECREASED FUEL CONSUMPTION, AND THE DELIVERY OF NEW SKILLS AND CAPABILITIES TO THE WORKFORCE. THE INTENDED BENEFICIARIES INCLUDE THE GEORGIA PORTS AUTHORITY (GRANTEE), TICO (PARTNER), WHICH WILL PROVIDE PORT TERMINAL TRACTORS AND ASSOCIATED TERMINAL OPERATING EQUIPMENT AND SERVICES, AND GEORGIA POWER (UTILITY PARTNER), WHICH WILL ENSURE ELECTRICITY DEMAND NEEDS ARE MET. INDIRECT BENEFICIARIES INCLUDE NEARBY PORT COMMUNITIES, WHICH WILL EXPERIENCE IMPROVED AIR QUALITY.
$48,763,746
PROJECT GRANT (B)
Jan 13, 2025
Georgia Ports Authority
2 Main Street
Department of Transportation / Maritime Administration
PORT INFRASTRUCTURE DEVELOPMENT PROGRAM
AWARD PURPOSE THE PURPOSE OF THE NEW COLONELS ISLAND TERMINAL BERTH NO. 4 IS TO SUPPORT INCREASED THROUGHPUT OF RO RO CARGO AT COLONELS ISLAND TERMINAL CIT. THE NEW BERTH WILL ALSO BE CAPABLE OF SERVICING THE LARGER FUTURE VESSELS AT THE BERTH. THE PROJECT INCLUDES I THE DEMOLITION AND DISPOSAL OF THE EXISTING STRUCTURES AND DREDGING THE CONSTRUCTION OF THE NEW DOCK STRUCTURE DOCK APPROACH WAY AND CONNECTOR BRIDGE AND MARINE STRUCTURES AND 3 THE CONSTRUCTION MANAGEMENT EFFORTS NECESSARY TO COMPLETE THE PROJECT. ACTIVITIES TO BE PERFORMED. THE PROJECT WILL BE COMPLETED IN TWO COMPONENTS UNDER TWO SEPARATE CONTRACTS FINAL ENGINEERING COMPLETE FINAL ENGINEERING AND DESIGN FOR THE PROJECT. BERTH CONSTRUCTION DREDGING DREDGING FOR THE PROJECT CONSISTS OF HYDRAULIC DREDGING OF THE PROPOSED BERTH TO A DEPTH MATCHING THE SOUTH BRUNSWICK RIVER DEPTH OF 36.0 FEET MEAN LOW WATER MLW WITH AN ALLOWANCE FOR ADVANCE MAINTENANCE AND OVER DREDGE OF 4.0 FEET 40.0 MLW. THE TOTAL VOLUME OF HYDRAULIC DREDGING IS APPROXIMATELY 385000 CUBIC YARDS CY. HYDRAULIC DREDGE MATERIAL WILL BE PLACED WITHIN THE ANDREWS ISLAND CONFINED DISPOSAL FACILITY.
PIER CONSTRUCTION AND OTHER WORKS DOCK STRUCTURE CONSTRUCT THE BERTH NO. 4 MAIN DOCK A PILE SUPPORTED CONCRETE SURFACE RO RO VESSEL DOCK MEASURING NOMINALLY 600 FEET LONG AND 140 FEET WIDE. THE PROPOSED STRUCTURE WILL UTILIZE PRECAST PILE CAPS AND DECK PANELS TO MINIMIZE OVER-THE-WATER CONSTRUCTION ACTIVITY. THE FACILITY WILL BE CAPABLE OF ACCOMMODATING A RO RO VESSEL UP TO ROUGHLY 970 FEET LONG AND 134 FEET WIDE. BOLLARDS AND CONE TYPE FENDERS WILL BE INSTALLED TO SUPPORT THE DESIGN VESSELS. DOCK APPROACH WAY AND DOCK CONNECTOR BRIDGE CONSTRUCT A PILE SUPPORTED ACCESS BRIDGE CONNECTING BERTH NO. 4 WITH THE MAIN ACCESS ROAD JOE FRANK HARRIS BOULEVARD TO PROVIDE FOR MOVEMENT OF AUTOMOBILES AND OTHER SELF-PROPELLED MACHINERY BETWEEN THE VESSEL BERTH AND STORAGE LOCATIONS AND CUSTOMER FACILITIES LOCATED IN OTHER PARTS OF THE CIT. CONSTRUCT A DOCK CONNECTOR BETWEEN BERTHS NO. 1 AND NO. 4. THE DOCK CONNECTOR PROVIDES ACCESS FOR HIGH AND HEAVY CARGO TO TRAVEL FROM BERTH NO. 4 ACROSS BERTH NO. 1 AND INTO THE NORTHWEST STORAGE LOTS WITHIN CIT. BERTH NO. 1 STRENGTHENING UPGRADE THE LANDSIDE PORTION OF EXISTING BERTH NO. 1 TO PROVIDE A DIRECT ACCESS ROUTE FOR THE MOVEMENT OF HEAVY EQUIPMENT BETWEEN BERTHS NO. 1 AND NO. 4 AND TERMINAL STORAGE AREAS ON THE MAINLAND. THIS UPGRADE WILL STREAMLINE CARGO MOVEMENTS BETWEEN THE BERTHS AND THE HEAVY EQUIPMENT STORAGE AREA WHICH WILL IMPROVE OPERATIONAL THROUGHPUT AND EFFICIENCY. MARINE STRUCTURES: CONSTRUCT THREE PILE SUPPORTED BREASTING STRUCTURES AND FOUR PILE SUPPORTED MOORING DOLPHINS EXTENDING EAST DOWNRIVER FROM THE END OF THE BERTH TO SECURE THE BOW OF THE SHIP WHEN MOORED AT THE BERTH. THE MARINE STRUCTURES ARE CONNECTED TO THE BERTH VIA PILE SUPPORTED CATWALKS SPANNING BETWEEN THE STRUCTURES. ADDITIONAL ELEMENTS INCLUDE WETLANDS MITIGATION: ENHANCE THE EXISTING WETLANDS BEHIND BERTH NO. 1 ALL MITIGATION WILL OCCUR ONSITE. ELECTRICAL EXTENSION OF THE ELECTRICAL FEED FROM EXISTING CIT BERTH NO. 1 TO BERTH NO. 4 INSTALLATION OF AREA LIGHTING ALONG THE APPROACH WAY CONNECTOR BRIDGE AND DOCK PLATFORM PROVISION OF SHIP HOTEL POWER AT THE DOCK FACE IN PRECAST ELECTRICAL VAULTS AND WORK LIGHTING AT EACH OF THE BREASTING AND MOORING DOLPHINS. MECHANICAL INSTALLATION OF POTABLE FIRE WATER PIPING VAULTS AND FIXTURES AT THE PROPOSED DOCK. WATER SERVICE FOR THE PROPOSED BERTH WILL COME FROM THE EXISTING WATERMAIN LOCATED LANDSIDE OF THE DOWNSTREAM END OF EXISTING BERTH 1. CIVIL WORK BACKFILLING GRADING AND COMPACTING SELECT MATERIAL FOR SUBGRADE, INSTALLATION OF A GRADED AGGREGATE BASE COURSE, PAVING WITH HOT MIX ASPHALTIC CONCRETE, AND INSTALLATION OF TRAFFIC CONTROL DEVICES SUCH AS SIGNAGE AND STRIPING. THIS WORK IS LIMITED TO THE PORTION OF THE PROJECT WHERE THE PROPOSED DOCK APPROACH WAY INTERSECTS WITH THE EXISTING JOE FRANK HARRIS BOULEVARD. CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT THE INSPECTION AND CONSTRUCTION MANAGEMENT FOR THE PROJECT WILL CONSIST OF DAILY AND WEEKLY INSPECTION REPORTS INTERPRETATION OF CONSTRUCTION PLANS AND SPECIFICATIONS, ON-SITE PROBLEM SOLVING, COORDINATION WITH THE RECIPIENT PORT OPERATIONS TO ENSURE MINIMAL IMPACT TO MARITIME OPERATIONS SHOP DRAWING REVIEW ENGINEER OF RECORD SERVICES AND MANAGEMENT OF THE ENTIRE CONSTRUCTION PROJECT. GEOTECHNICAL AND TESTING SERVICES: THE GEOTECHNICAL AND TESTING SERVICES FOR THE PROJECT WILL CONSIST OF ALL GEOTECHNICAL AND PILE DRIVING TESTING AND VERIFICATION SERVICES TO ENSURE COMPLIANCE WITH APPROVED CONSTRUCTION PLANS AND SPECIFICATIONS. PHOTOGRAPHIC DOCUMENTATION AERIAL DRONE EQUIPMENT FOR WEEKLY IN HOUSE PHOTOGRAPHIC DOCUMENTATION OF THE PROJECT. DELIVERABLES EXPECTED OUTCOMES PERFORMANCE MEASURE TABLE FROM ATTACHMENT C PAGE 9 OF THE GRANT AGREEMENT CARGO VOLUMES. TOTAL TONS OF CARGO MOVED PER QUARTER TEUS OR SHORT TONS. CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. WHEN APPLICABLE REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU AND BULK IN TONS OR TYPE OF INTERMODAL TRANSPORT TRUCK OR RAIL. VESSEL CALLS. TOTAL VESSEL CALLS PER QUARTER. MEASURES THE NUMBER OF VESSELS CALLING TO THE PROJECT STUDY AREA. MUST BE REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE: VESSEL TYPE EG CONTAINER BULK RO RO LNG FREIGHT CAPACITY VESSEL LENGTH. TRUCK MILES REDUCED. NUMBER OF TRUCK MILES REDUCED PER QUARTER. TOTAL TRUCK MILES REDUCED, CALCULATED INTO REDUCED GREENHOUSE GAS EMISSIONS, CARBON MONOXIDE, AND PARTICULATE MATTER FOR MODE OF TRANSPORTATION DEFINED IN THE PROJECT STUDY AREA. INTENDED BENEFICIARY GPA. SUBRECIPIENT ACTIVITIES NONE.
$14,647,284
PROJECT GRANT (B)
Jul 15, 2024
Georgia Ports Authority
2 Main Street
Department of Homeland Security / Federal Emergency Management Agency
PORT SECURITY GRANT PROGRAM
PORT SECURITY GRANT PROGRAM
$2,501,256
PROJECT GRANT (B)
Sep 28, 2025
Georgia Ports Authority
2 Main Street
Department of Homeland Security / Federal Emergency Management Agency
PORT SECURITY GRANT PROGRAM
PORT SECURITY GRANT PROGRAM
$974,659
PROJECT GRANT (B)
Sep 17, 2024
Georgia Ports Authority
2 Main Street
Environmental Protection Agency
DIESEL EMISSION REDUCTION ACT (DERA) NATIONAL GRANTS
DESCRIPTION:THIS ACTION APPROVES AN INCREASE OF $150,000 TO SUPPORT GEORGIA PORTS AUTHORITY ONGOING ACTIVITIES OF THE NATIONAL DIESEL EMISSIONS REDUCTION ACT.ACTIVITIES:THE PURPOSE OF THIS NATIONAL DIESEL EMISSIONS REDUCTION ACT FUNDED COOPERATIVE AGREEMENT IS TO PROVIDE FUNDS TO THE GEORGIA PORTS AUTHORITY IN ITS EFFORTS TO REPLACE 39, 2009 OR OLDER VINTAGE DRAY TRUCKS WITH 2015 OR NEWER ENGINE MODEL YEAR, CLASS 8, 33,001 GROSS VEHICLE WEIGHT RATING OR GREATER THAT REGULARLY DRAY CONTAINERS THROUGH AN INNOVATIVE REBATE/FINANCING PROGRAM. REPLACEMENT TRUCKS WILL BE POWERED BY 2015 ENGINE MODEL YEARS OR NEWER HEAVY-DUTY ENGINES WITH THE OLDER REPLACED TRUCKS SCRAPPED FOR PROGRAM INCOME TO REDUCE LEASE COSTS, WILL HAVE LOWER DIESEL EMISSIONS AND GREATER FUEL EFFICIENCY THAT ACHIEVE SIGNIFICANT LIFETIME REDUCTIONS OF 10,869.776 SHORT TONS OF DIESEL EMISSIONS AND AN ESTIMATED 871,083 GALLONS OF DIESEL FUEL.SUBRECIPIENT:OUTCOMES: THE PROJECT OUTCOMES SUSTAINABILITY OF DECREASED DIESEL EMISSIONS IS OBVIOUS AS THE OLDER, MORE POLLUTING VEHICLES DESTROYED WILL NEVER GENERATE DIESEL EMISSIONS AGAIN, AND AN INCREASED IMPROVEMENT IN THE LIFE OF NEW ENGINES OVER PRIOR ENGINES. DIRECT BENEFICIARIES OF THIS PROGRAM INCLUDE RESIDENTS OF CHATHAM COUNTY, GEORGIA.
$1,341,445
PROJECT GRANT (B)
Nov 17, 2023
Schools & Education
Part of Chatham County School District. 3 nearby schools serving this area.
E
Elementary Garden City Elementary School
Score 31/100
Enrollment 806
Distance 0.6 mi
M
Middle Derenne Middle School
Score 16/100
Enrollment 600
Distance 4.0 mi
H
High School Groves High School
Enrollment 673
Distance 0.9 mi
Source: National Center for Education Statistics (NCES) · Updated Feb 2026
At a Glance
Avg Home Value
$504,876
$986/yr tax · 0.2% rate
Est. Monthly Cost
$2,845
$2,553 mortgage · $82 tax
Best School
31/100
3 nearby schools
Stability
Stable
6 homes · 1 street
Main St exhibits moderate stability with a mix of long-term and newer residents.
Continue Your Research
Frequently Asked Questions
What is the average home value in Main St?
The average assessed property value in Main St is $504,876, with average annual property taxes of $986.
What school district is Main St in?
Main St is served by Chatham County School District. The highest-rated nearby school scores 31/100.
How many homes are in Main St?
Main St in Savannah, GA has 6 homes across 1 street.
Is Main St good for families?
Main St is served by Chatham County School District (top school score: 31/100), average home value of $504,876. The neighborhood has 6 homes across 1 street, providing a close-knit community for families.
How much does it cost to live in Main St?
The average assessed home value is $504,876, and annual property taxes average $986, and the estimated total monthly housing cost (mortgage, taxes, and insurance) is approximately $2,845. These estimates are based on a 30-year mortgage at 6.5% with 20% down.
What elementary school serves Main St?
The nearest elementary school is Garden City Elementary School, located 0.6 miles away. It has 806 students enrolled.
What high school serves Main St?
The nearest high school is Groves High School, located 0.9 miles away.
What are property taxes in Main St?
The average annual property tax in Main St is $986, with an effective tax rate of approximately 0.20% based on average assessed values of $504,876.
Is Main St a stable neighborhood?
Main St has a stability score of 55/100, classified as "Stable." This indicates moderate stability with some residential turnover.
Data Sources & Methodology
6 verified data sources power this report
Property tax & valuation records
Federal education statistics
Healthcare facility & outcome data
Transportation & hazard data
5-year community survey estimates
Housing market indicators
Last updated:
View full methodologyGet Neighborhood Updates
Stay informed about changes in Main St.
Overview