Skip to main content
R
NeighborhoodReport

Peachtree Center Ave

Atlanta, GA 30303 Luxury
1
Homes
1
Streets
$1,119,537
Avg Home

Address Directory

1 245 Peachtree Center Ave Ne

Owner: Atlanta-Region Transit Link Authority
7 vehicles CEO - The Hylton Group, INC. 31 businesses Aircraft Owner Fed Grant Nonprofit
$1,119,537
View on Zillow →

Source: County assessor records, public records & state business filings · Updated Feb 2026

Loading map...

Commercial Fleet Presence

FMCSA Motor Carrier Registry

Heavy
71
Carriers
360
Power Units
765
Drivers
5.1
Avg Fleet
For-Hire: 51
Private: 20
Passenger: 10
Largest Carriers in ZIP
NORTH CENTER PRODUCTIONS INC
DOT #1922310 · Interstate
100 units
200 drivers
ABM-LANIER-HUNT
DOT #2988460 · Intrastate
61 units
168 drivers
QUIKPAK LOGISTICS LLC
DOT #3309506 · Intrastate
40 units
80 drivers
ATLANTA TRANSPORTATION SYSTEMS INC
DOT #1674345 · Intrastate
21 units
21 drivers
GOODWILL INDUSTRIES OF NORTH GEORGIA INC
DOT #2055641 · Intrastate
14 units
17 drivers

71 registered motor carriers in this ZIP. operating 360 power units. 51 for-hire carriers.

Explore Nearby in Atlanta

Discover other neighborhoods in Atlanta, GA and compare what they have to offer.

EPA Regulated Facilities

EPA Facility Registry Service

Very High
474
< 1 Mile
500
< 3 Miles
500
< 5 Miles
High
Concern
Facility Categories
💨 Air Emissions 56 Hazardous Waste 30 Superfund 5 🏚 Brownfields 10 💧 Water Discharge 8 🛢 Underground Storage 1 🏛 Federal Facilities 10 🚰 Water Systems 5
Facilities of Concern
MARQUIS ONE TOWER MERCURY
SUPERFUND (NON-NPL)
0.02 mi
AFC MERCURY SPILL
SUPERFUND (NON-NPL)
0.4 mi
SAM NUNN ATLANTA FEDERAL CENTER PROJECT
REMEDIATION AND REDEVELOPMENT PROGRAMS: SUPERFUND NPL, SUPERFUND (NON-NPL), SUPERFUND NPL
0.46 mi
GEORGIA POWER - GENERAL OFFICE
AIR MAJOR, ENFORCEMENT/COMPLIANCE ACTIVITY, FORMAL ENFORCEMENT ACTION
0.47 mi
GEORGIA STATE UNIVERSITY
AIR SYNTHETIC MINOR, ENFORCEMENT/COMPLIANCE ACTIVITY, FORMAL ENFORCEMENT ACTION
0.53 mi

500 EPA-regulated facilities within 5 miles. 474 within 1 mile. 5 Superfund sites. 30 hazardous waste generators. 5 water systems serve the area.

Federal Grants & Assistance

USAspending.gov grant awards to recipients in this neighborhood.

24 grant records found FY2024–2025
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
BUSES AND BUS FACILITIES FORMULA, COMPETITIVE, AND LOW OR NO EMISSIONS PROGRAMS
APPLICATION PURPOSE: THE GEORGIA STATE UNIVERSITY VEHICLE REPLACEMENT - ELECTRIC BUS CHARGING EQUIPMENT PROGRAM WILL REPLACE 20 DIESEL SET TO BE RETIRED WITH 18 NEW ZERO-EMISSION BATTERY ELECTRIC COMMUTER BUSES. TO SUPPORT THE NEW ELECTRIC BUSES THIS PROJECT ALSO INCLUDES THE ACQUISITION OF RELOCATABLE CHARGING EQUIPMENT THAT CAN BE RELOCATED BASED ON NEED. THE ATLANTA-REGION TRANSIT LINK AUTHORITY (ATL) IS THE DIRECT RECIPIENT OF FUNDS FOR THIS PROGRAM AND WILL ENTER IN TO A DIRECT RECIPIENT/SUB RECIPIENT AGREEMENT WITH GEORGIA STATE UNIVERSITY (GSU).; ACTIVITIES PERFORMED: GSU WAS AWARDED $22286745 IN FEDERAL FUNDING FOR THE PROJECT THROUGH THE F2023 SECTION 5339(C) LOW NO PROGRAM (AWARD ID D2023-LWNO-021). THE PROJECT IS REFLECTED IN THE ATLANTA UZAS PROGRAM OF PROJECTS LAST UPDATED DECEMBER 2023. FUNDS WILL BE USED TO PURCHASE BUSES BATTERY WARRANTIES BUS DIAGNOSTIC TOOLS BUY AMERICA AUDITS QA INSPECTIONS WORKFORCE TRAINING AND PROJECT MANAGEMENT/TECHNICAL ASSISTANCE FROM CONSULTANTS. FOR CHARGING EQUIPMENT FEDERAL FUNDS WILL ALSO BE USED TO PURCHASE AND INSTALL RELOCATABLE CHARGERS DISPENSERS AND CHARGE MANAGEMENT SOFTWARE.IN ITS APPLICATION GSU NAMED THE FOLLOWING PARTNERS:ELDORADO NATIONAL: PROVISION OF BUY AMERICA COMPLIANT BUSES WITH BATTERIES INSTALLED.CENTER FOR TRANSPORTATION THE ENVIRONMENT: TECHNICAL ASSISTANCE WITH PROGRAM DEPLOYMENT.HELIOX ATLANTA: PROVISION OF RELOCATABLE CHARGING EQUIPMENT.GEORGIA POWER: CHARGING EQUIPMENT INSTALLATION ASSISTANCE.TECHNICAL COLLEGE SYSTEM OF GEORGIA: WORKFORCE ASSISTANCE.CAREERRISE: WORKFORCE ASSISTANCE; EXPECTED OUTCOMES: OLD DIESEL BUSES WILL BE REPLACED WITH BATTERY ELECTRIC BUSES NEW BUSES WILL HAVE LESS MAINTENANCE DOWNTIME COMPARED TO THE AGING DIESEL FLEET ELECTRIC BUSES WILL NOT GENERATE CARBON EMISSIONS IN THE SERVICED COMMUNITIES.; INTENDED BENEFICIARIES: THE TRANSITION WILL IMPROVE RIDER EXPERIENCE AND THE COMMUNITIES IN WHICH THE BUSES OPERATE IN BY SUBSTANTIALLY REDUCING HARMFUL EMISSIONS AND NOISE POLLUTION.; SUBRECIPIENT ACTIVITIES: GSU WILL OPERATE AND MAINTAIN ALL ACQUIRED ELECTRIC BUSES AND PORTABLE CHARGING EQUIPMENT.
$22,286,745
PROJECT GRANT (B)
Apr 30, 2024
Habitat For Humanity International INC
285 Peachtree Center Ave Ne
Department of Housing and Urban Development / Assistant Secretary for Community Planning and Development
SECTION 4 CAPACITY BUILDING FOR COMMUNITY DEVELOPMENT AND AFFORDABLE HOUSING
PURPOSE: THROUGH FUNDING OF NATIONAL INTERMEDIARIES, THE SECTION 4 CAPACITY BUILDING FOR COMMUNITY DEVELOPMENT AND AFFORDABLE HOUSING PROGRAM (SECTION 4) ENHANCES THE CAPACITY AND ABILITY OF COMMUNITY DEVELOPMENT CORPORATIONS (CDCS) AND COMMUNITY HOUSING DEVELOPMENT ORGANIZATIONS (CHDOS) TO CARRY OUT AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT ACTIVITIES. DETAILS OF FUNDING CAN BE FOUND ON THE WEBSITE. HTTPS://WWW.HUD.GOV/PROGRAM_OFFICES/COMM_PLANNING/SECTION-4.; ACTIVITIES TO BE PERFORMED: 1. TRAINING, EDUCATION, SUPPORT, AND ADVICE TO ENHANCE THE TECHNICAL AND ADMINISTRATIVE CAPABILITIES OF CDCS AND CHDOS. THIS MAY INCLUDE BUILDING THE CAPACITY OF CDCS AND CHDOS TO: A. PARTICIPATE IN CONSOLIDATED PLANNING, FAIR HOUSING PLANNING AND CONTINUUM OF CARE HOMELESS ASSISTANCE EFFORTS THAT HELP ENSURE COMMUNITY-WIDE PARTICIPATION IN ASSESSING AREA NEEDS; B. NAVIGATE THE INCREASED HOUSING AND COMMUNITY DEVELOPMENT RESOURCES PROVIDED BY THE FEDERAL GOVERNMENT AND ASSIST IN DIRECTING FEDERAL INVESTMENTS TO UNDERSERVED COMMUNITIES; C. CONSULT BROADLY WITHIN THE COMMUNITY; D. COOPERATIVELY PLAN FOR THE USE OF AVAILABLE RESOURCES IN A COMPREHENSIVE AND HOLISTIC MANNER; AND E. ASSIST IN EVALUATING PERFORMANCE UNDER THESE COMMUNITY PLANNING AND COORDINATION EFFORTS AND IN LINKING PLANS WITH NEIGHBORING COMMUNITIES TO FOSTER REGIONAL PLANNING. 2. PASS-THROUGH GRANTS, LOANS, PREDEVELOPMENT ASSISTANCE, OR OTHER FINANCIAL ASSISTANCE TO CDCS AND CHDOS TO INCREASE THEIR CAPACITY TO CARRY OUT COMMUNITY DEVELOPMENT AND AFFORDABLE HOUSING ACTIVITIES THAT BENEFIT LOW-INCOME OR LOW- AND MODERATE-INCOME FAMILIES AND PERSONS. 3. SUCH OTHER ACTIVITIES AS MAY BE DETERMINED BY THE GRANTEES IN CONSULTATION WITH THE SECRETARY OR HIS OR HER DESIGNEE.; EXPECTED OUTCOMES: THE EXPECTED OUTCOMES OF THE SECTION 4 PROGRAM ELIGIBLE BENEFICIARIES’ MUST DEMONSTRATE IMPROVED SKILLS, TECHNICAL CAPABILITIES, AND ABILITY TO UNDERTAKE COMMUNITY DEVELOPMENT AND AFFORDABLE HOUSING ACTIVITIES THAT WILL BE IDENTIFIED AND MEASURED.; INTENDED BENEFICIARIES: ELIGIBLE BENEFICIARIES ARE LIMITED TO THE CDCS AND CHDOS.; SUBRECIPIENT ACTIVITIES: THE SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.
$11,333,333
PROJECT GRANT (B)
Aug 29, 2024
Habitat For Humanity International INC
285 Peachtree Center Ave Ne
Department of Housing and Urban Development / Assistant Secretary for Community Planning and Development
SECTION 4 CAPACITY BUILDING FOR COMMUNITY DEVELOPMENT AND AFFORDABLE HOUSING
PURPOSE: THROUGH FUNDING OF NATIONAL INTERMEDIARIES, THE SECTION 4 CAPACITY BUILDING FOR COMMUNITY DEVELOPMENT AND AFFORDABLE HOUSING PROGRAM (SECTION 4) ENHANCES THE CAPACITY AND ABILITY OF COMMUNITY DEVELOPMENT CORPORATIONS (CDCS) AND COMMUNITY HOUSING DEVELOPMENT ORGANIZATIONS (CHDOS) TO CARRY OUT AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT ACTIVITIES. DETAILS OF FUNDING CAN BE FOUND ON THE WEBSITE. HTTPS://WWW.HUD.GOV/PROGRAM_OFFICES/COMM_PLANNING/SECTION-4.; ACTIVITIES TO BE PERFORMED: 1. TRAINING, EDUCATION, SUPPORT, AND ADVICE TO ENHANCE THE TECHNICAL AND ADMINISTRATIVE CAPABILITIES OF CDCS AND CHDOS. THIS MAY INCLUDE BUILDING THE CAPACITY OF CDCS AND CHDOS TO: A. PARTICIPATE IN CONSOLIDATED PLANNING, FAIR HOUSING PLANNING AND CONTINUUM OF CARE HOMELESS ASSISTANCE EFFORTS THAT HELP ENSURE COMMUNITY-WIDE PARTICIPATION IN ASSESSING AREA NEEDS; B. NAVIGATE THE INCREASED HOUSING AND COMMUNITY DEVELOPMENT RESOURCES PROVIDED BY THE FEDERAL GOVERNMENT AND ASSIST IN DIRECTING FEDERAL INVESTMENTS TO UNDERSERVED COMMUNITIES; C. CONSULT BROADLY WITHIN THE COMMUNITY; D. COOPERATIVELY PLAN FOR THE USE OF AVAILABLE RESOURCES IN A COMPREHENSIVE AND HOLISTIC MANNER; AND E. ASSIST IN EVALUATING PERFORMANCE UNDER THESE COMMUNITY PLANNING AND COORDINATION EFFORTS AND IN LINKING PLANS WITH NEIGHBORING COMMUNITIES TO FOSTER REGIONAL PLANNING. 2. PASS-THROUGH GRANTS, LOANS, PREDEVELOPMENT ASSISTANCE, OR OTHER FINANCIAL ASSISTANCE TO CDCS AND CHDOS TO INCREASE THEIR CAPACITY TO CARRY OUT COMMUNITY DEVELOPMENT AND AFFORDABLE HOUSING ACTIVITIES THAT BENEFIT LOW-INCOME OR LOW- AND MODERATE-INCOME FAMILIES AND PERSONS. 3. SUCH OTHER ACTIVITIES AS MAY BE DETERMINED BY THE GRANTEES IN CONSULTATION WITH THE SECRETARY OR HIS OR HER DESIGNEE.; EXPECTED OUTCOMES: THE EXPECTED OUTCOMES OF THE SECTION 4 PROGRAM ELIGIBLE BENEFICIARIES’ MUST DEMONSTRATE IMPROVED SKILLS, TECHNICAL CAPABILITIES, AND ABILITY TO UNDERTAKE COMMUNITY DEVELOPMENT AND AFFORDABLE HOUSING ACTIVITIES THAT WILL BE IDENTIFIED AND MEASURED.; INTENDED BENEFICIARIES: ELIGIBLE BENEFICIARIES ARE LIMITED TO THE CDCS AND CHDOS.; SUBRECIPIENT ACTIVITIES: THE SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.
$11,000,000
PROJECT GRANT (B)
Aug 29, 2024
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
FEDERAL TRANSIT FORMULA GRANTS
APPLICATION PURPOSE: THIS GRANT RECOGNIZES 5307 URBANIZED AREA FORMULA FUNDS 5337 HIGH INTENSITY MOTOR BUS FUNDS AND 5339A BUS AND BUS FACILITIES FORMULA FUNDS APPORTIONED TO THE ATLANTA URBANIZED AREA SUB-ALLOCATED TO THE GEORGIA REGIONAL TRANSPORTATION AUTHORITY AND TRANSFERRED TO THE ATLANTA-REGION TRANSIT LINK AUTHORITY. THE FY 2026 XPRESS PROGRAM GRANT PROJECTS INCLUDE FUNDS FOR THE FOLLOWING ITEMS:- FY 2021 THROUGH FY 2023 5307 URBANIZED AREA FORMULA FUNDS ($2599590 FROM FY 2021 $1953283 FROM FY 2022 AND $4133223 FROM FY 2023 TOTALING $8686096) WILL COVER THE FOLLOWING:- PREVENTIVE MAINTENANCE- CAPITAL COST OF CONTRACTING FOR VANPOOL- REGIONAL VANPOOL PROGRAM- REGIONAL MOBILITY MANAGEMENT- PROJECT ADMINISTRATION- SHORT RANGE TRANSIT PLANNING- FY 2021 5337 URBANIZED AREA FORMULA FUNDS TOTALING $2131508 OF WHICH $1031508 WILL SUPPORT PREVENTIVE MAINTENANCE AMONG PARK AND RIDE LOTS AND VEHICLES SUCH AS VEHICLE MAINTENANCE HVACS FACILITY REPAIRS AND BACKFLOW TESTING AND $1049964 FOR CAPITAL COST OF CONTRACTING FOR TRANSDEV AND $50036 FOR THE BUS WASH RENOVATION AT SOUTH OPS.- FY 2022 5339(A) BUS AND BUS FACILITIES FUNDS TOTALING $1049964 WHICH WILL SUPPORT THE BUS WASH RENOVATION AT SOUTH OPS.BOTH THE 1% SECURITY ALLOCATION REQUIREMENT AND THE 0.75% SAFETY ALLOCATION REQUIREMENT FOR 5307 FUNDS ARE ADDRESSED IN ALI 11.7A.00 - PREVENTATIVE MAINTENANCE. THE SERVICES PROVIDED BY THE 3RD PARTY CONTRACTOR INCLUDE MAINTENANCE OF SECURITY AND SAFETY RELATED SERVICES. THE ELIGIBLE CAPITAL ASSISTANCE ACTIVITIES ARE OUTLINED IN THE PROJECT DETAILS OF THE APPLICATION; ATL DOES NOT ANTICIPATE PURCHASING ANY CAPITAL EQUIPMENT IN EXCESS OF $10000 USING THESE FUNDS.THE SOURCE OF LOCAL MATCH FUNDING FOR XPRESS RELATED ACTIVITIES ORIGINATES FROM STATE APPROPRIATIONS.THE RECIPIENT OR SUB-RECIPIENT (WHEN APPLICABLE) WILL ENSURE CONTRACTORS PROCURED WILL NOT BE ON THE FTA SUSPENSION AND DEBARMENT LIST.THE RECIPIENT OR SUB-RECIPIENT (WHEN APPLICABLE) WILL FOLLOW ALL 3RD PARTY PROCUREMENT POLICIES AS DEFINED IN C4220.1F (THIRD PARTY CONTRACTING GUIDANCE).IN ADDITION TO FTAS BUY AMERICA ACT WHICH REQUIRES THAT THE STEEL IRON AND MANUFACTURED GOODS USED IN AN FTA-FUNDED PROJECT ARE PRODUCED IN THE UNITED STATES (49 U.S.C. 5323(J)(1)) THE BUILD AMERICA BUY AMERICA ACT (BABA) (PUBLIC LAW 117-58 DIV. G 70914(A)) NOW REQUIRES THAT CONSTRUCTION MATERIALS USED IN INFRASTRUCTURE PROJECTS ARE ALSO PRODUCED IN THE UNITED STATES. REFER TO TERMS AND CONDITIONS IN FTAS MASTER AGREEMENT SECTION 15. THE BABA REQUIREMENT APPLIES TO THIS GRANT IN ADDITION TO THE BUY AMERICA ACT EXCEPT TO THE EXTENT A WAIVER OF EITHER REQUIREMENTS MAY APPLY.; ACTIVITIES PERFORMED: XPRESS OPERATIONS MAINTENANCE AND PLANNING; EXPECTED OUTCOMES: IMPROVED SERVICE REDUCED CONGESTION DURING PEAK HOURS RELIABLE TRANSIT FOR SHIFT WORKERS; INTENDED BENEFICIARIES: COMMUTERS AND SHIFT WORKERS IN THE ATLANTA REGION AND SURROUNDING COUNTIES WITHIN ATL SERVICE AREA; SUBRECIPIENT ACTIVITIES: NONE
$11,984,685
FORMULA GRANT (A)
Aug 18, 2025
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
FEDERAL TRANSIT FORMULA GRANTS
APPLICATION PURPOSE: OPERATING COSTS FOR FY24 AND FY25; ACTIVITIES PERFORMED: ANNUAL COST OF CONTRACTING PREVENTATIVE MAINTENANCE AND PLANNING ACTIVITIES GRANT FOR XPRESS; EXPECTED OUTCOMES: REDUCED CONGESTION DURING PEAK HOURS RELIABLE TRANSIT FOR SHIFT WORKERS; INTENDED BENEFICIARIES: COMMUTERS AND SHIFT WORKERS IN THE ATLANTA REGION; SUBRECIPIENT ACTIVITIES: NONE
$13,287,714
FORMULA GRANT (A)
May 21, 2025
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
FEDERAL TRANSIT FORMULA GRANTS
APPLICATION PURPOSE: THE ATLANTA-REGION TRANSIT LINK AUTHORITY REQUESTS FTA 5307 URBANIZED AREA FORMULA FUNDS TO SUPPORT THE AUTOMATED FARE COLLECTION 2.0 (AFC 2.0) PROJECT. AFC 2.0 REPLACES THE EXISTING REGIONAL BREEZE CARD AFC SYSTEM WITH THE NEW AND ENHANCED AFC CLOUD BASED OPEN PAYMENT SYSTEM.; ACTIVITIES PERFORMED: ATL WILL FUND AND MANAGE AFC 2.0 DEPLOYMENT FOR ALL REGIONAL AGENCIES.; EXPECTED OUTCOMES: KEY ELEMENTS INCLUDE: DESIGN/CONFIGURATION OF BACK OFFICE TO MEET BUSINESS RULES INSTALLATION OF NEW ONBOARD VALIDATORS/FAREBOX. INTEGRATION WITH EXISTING REGIONAL PARTNER FARE EQUIPMENT TESTING TRAINING AND QUALITY ASSURANCE.; INTENDED BENEFICIARIES: COMMUTERS AND SHIFT WORKERS IN THE ATLANTA REGION; SUBRECIPIENT ACTIVITIES: NONE
$5,424,000
FORMULA GRANT (A)
May 8, 2025
Habitat For Humanity International INC
285 Peachtree Center Ave Ne
Department of Housing and Urban Development / Assistant Secretary for Community Planning and Development
SELF-HELP HOMEOWNERSHIP OPPORTUNITY PROGRAM
PURPOSE: THE SELF-HELP HOMEOWNERSHIP OPPORTUNITY PROGRAM (SHOP) AWARDS GRANT FUNDS TO ELIGIBLE NATIONAL AND REGIONAL NONPROFIT ORGANIZATIONS AND CONSORTIA TO PURCHASE HOME SITES AND DEVELOP OR IMPROVE THE INFRASTRUCTURE NEEDED TO SET THE STAGE FOR SWEAT EQUITY AND VOLUNTEER-BASED HOMEOWNERSHIP PROGRAMS FOR LOW-INCOME PERSONS AND FAMILIES. SHOP FUNDS MUST BE USED FOR ELIGIBLE EXPENSES TO DEVELOP DECENT, SAFE, AND SANITARY NON-LUXURY HOUSING FOR LOW-INCOME PERSONS AND FAMILIES WHO OTHERWISE WOULD NOT BECOME HOMEOWNERS. HOMEBUYERS MUST BE WILLING TO CONTRIBUTE SIGNIFICANT AMOUNTS OF THEIR OWN SWEAT EQUITY TOWARD THE CONSTRUCTION OR REHABILITATION OF THEIR HOMES. PROJECT SUMMARIES CAN BE FOUND AT HTTPS://WWW.HUDEXCHANGE.INFO/PROGRAMS/SHOP/.; ACTIVITIES TO BE PERFORMED: SHOP GRANT FUNDS CAN ONLY BE USED FOR LAND ACQUISITION, INFRASTRUCTURE IMPROVEMENTS, AND ADMINISTRATIVE COSTS. TOTAL LAND ACQUISITION AND INFRASTRUCTURE IMPROVEMENT COSTS CANNOT EXCEED AN AVERAGE OF $25,000 IN SHOP ASSISTANCE PER UNIT. ADMINISTRATIVE COSTS CANNOT EXCEED 20 PERCENT OF THE SHOP GRANT AMOUNT. SHOP GRANTEES MUST LEVERAGE OTHER FUNDS FOR THE NEW CONSTRUCTION OR REHABILITATION OF THEIR SHOP UNITS.; EXPECTED OUTCOMES: EXPECTED OUTCOMES OF THE SHOP GRANT PROGRAM INCLUDE PROVIDING HOMES FOR LOW-INCOME PERSONS AND FAMILIES TO PURCHASE THROUGH AFFORDABLE FINANCING AND SWEAT EQUITY.; INTENDED BENEFICIARIES: INTENDED BENEFICIARIES OF SHOP GRANT FUNDS ARE LOW-INCOME INDIVIDUALS AND FAMILIES SEEKING HOMEOWNERSHIP.; SUBRECIPIENT ACTIVITIES: THE SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.
$4,750,000
PROJECT GRANT (B)
Aug 20, 2024
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
FEDERAL TRANSIT FORMULA GRANTS
APPLICATION PURPOSE: THE SHARED SERVICES PROGRAM GRANT CONTAINS 5307 FUNDING DESIGNATED FOR SUBRECIPIENTS WHO HAVE REQUESTED THAT THE ATL ACT AS THEIR DIRECT RECIPIENT. THE ATL ALSO PROVIDES GUIDANCE AND SUPPORT SERVICES FOR THE SUBRECIPIENTS. THREE SUBRECIPIENT PROJECTS ARE ADMINISTERED THROUGH THIS GRANT:- THREE RIVERS REGIONAL COMMISSION: SUPPORTING THE 5307-ELIGIBLE SERVICE WITHIN THE 7-COUNTY TRANSIT PROGRAM. THESE FUNDS WILL SUPPORT 5 REPLACEMENT BUSES AND CADAVL SOFTWARE 1 ADMINISTRATIVE NON-REVENUE VEHICLE COMPUTER HARDWARE AND RADIOS. - COWETA COUNTY: PROVIDES DEMAND RESPONSE SERVICE OPERATING ASSISTANCE EQUIPMENT AND PLANNING ACTIVITIES.THESE FUNDS WILL SUPPORT JARC OPERATING ASSISTANCE FOR STATE FISCAL YEAR (FY) 2025 AND 2026 IN ADDITION TO SHORT RANGE PLANNING CADAVL SOFTWARE AND RADIOS.- FORSYTH COUNTY: PROVIDES DEMAND RESPONSE SERVICES JOB ACCESS REVERSE COMMUTE OPERATING ASSISTANCE.THESE FUNDS WILL SUPPORT JARC OPERATING ASSISTANCE FOR CALENDAR YEAR 2024.THIS GRANT APPLICATION REQUESTS FEDERAL 5307 ATLANTA URBANIZED AREA (UZA) FORMULA FUNDS IN THE TOTAL AMOUNT OF $2209815. ALL FUNDING ASSOCIATED WITH THIS GRANT IS COMING FROM THE FY 2021 APPORTIONMENT. THE THREE RIVERS REGIONAL COMMISSION PROJECT REQUESTS 5307 FUNDS IN THE AMOUNT OF $731460. THE COWETA COUNTY PROJECT REQUESTS 5307 FUNDS IN THE AMOUNT OF $810326. THE FORSYTH COUNTY PROJECT REQUESTS 5307 FUNDS IN THE AMOUNT OF $668029. UPDATED REGIONAL BALANCE SHEETS FOR THE ATL THREE RIVERS REGIONAL COMMISSION FORSYTH AND COWETA ARE ATTACHED TO SHOW THE RELEVANT TRANSFERS OF 5307 FUNDS TO ATL TO COVER THESE PROJECT COSTS. ELIGIBLE ACTIVITIES ARE OUTLINED IN THE PROJECT DETAILS OF THE APPLICATION.THE SOURCE OF LOCAL MATCH FUNDING FOR THIS AWARD ORIGINATES FROM THE SUBRECIPIENTS GENERAL OR TRANSPORTATION FUNDS.THE ATL WILL ENSURE THAT SUBRECIPIENTS UTILIZE AT LEAST 1% OF THE GRANT FUNDS FOR PUBLIC TRANSPORTATION SECURITY ENHANCEMENTS AND AT LEAST 0.75% FOR SAFETY PROJECTS UNDER ALI 11.42.20 - BUS SUPPORT EQUIPMENT (WHICH WILL SUPPORT CAMERAS AND SECURITY EQUIPMENT) AND 30.09.05 - JARC OPERATING ASSISTANCE (WHICH WILL SUPPORT CADAVL SOFTWARE RENEWALS).THE ATL WILL ENSURE THAT FOLLOW ALL SUBRECIPIENT ACTIVITIES FOLLOW PROCUREMENT POLICIES IN COMPLIANCE WITH FEDERAL RULES AND REGULATIONS AS DEFINED IN C4220.1F (THIRD PARTY CONTRACTING GUIDANCE) AND THAT CONTRACTORS PROCURED WILL ARE NOT ON THE FTA SUSPENSION AND DEBARMENT LIST.; ACTIVITIES PERFORMED: - THREE RIVERS REGIONAL COMMISSION: SUPPORTING THE 5307-ELIGIBLE SERVICE WITHIN THE 7-COUNTY TRANSIT PROGRAM. THESE FUNDS WILL SUPPORT 5 REPLACEMENT BUSES AND CADAVL SOFTWARE 1 ADMINISTRATIVE NON-REVENUE VEHICLE COMPUTER HARDWARE AND RADIOS. - COWETA COUNTY: PROVIDES DEMAND RESPONSE SERVICE OPERATING ASSISTANCE EQUIPMENT AND PLANNING ACTIVITIES.THESE FUNDS WILL SUPPORT JARC OPERATING ASSISTANCE FOR STATE FISCAL YEAR (FY) 2025 AND 2026 IN ADDITION TO SHORT RANGE PLANNING CADAVL SOFTWARE AND CAMERA/SECURITY EQUIPMENT.- FORSYTH COUNTY: PROVIDES DEMAND RESPONSE SERVICES JOB ACCESS REVERSE COMMUTE OPERATING ASSISTANCE.THESE FUNDS WILL SUPPORT JARC OPERATING ASSISTANCE FOR CALENDAR YEAR 2024.; EXPECTED OUTCOMES: ACTIVITIES SUPPORTED BY THESE FUNDS WILL IMPROVE ACCESS TO JOBS AND SITES OF EMPLOYMENT THROUGHOUT THE THREE RIVERS REGIONAL COMMISSION COWETA COUNTY AND FORSYTH COUNTY. IN ADDITION AN ASSOCIATED OUTCOME IS TO STRENGTHEN THE RELATIONSHIPS AND CONNECTIVITY BETWEEN EXISTING PUBLIC TRANSPORTATION OPERATORS WITHIN THE ATLANTA REGION. ADJACENT COUNTIES WITH EXISTING URBAN PUBLIC TRANSPORTATION PROVIDERS INCLUDE: CHEROKEE COUNTY (CHEROKEE AREA TRANSPORTATION SYSTEM) FULTON COUNTY (MARTA) GWINNETT COUNTY (GWINNETT COUNTY TRANSIT) AND HALL COUNTY (HALL AREA TRANSIT). WITH THESE FUNDS THE THREE RIVERS REGIONAL COMMISSION COWETA COUNTY AND FORSYTH COUNTY WILL UTILIZE URBAN PUBLIC TRANSPORTATION FUNDING TO PROVIDE SERVICE AND CONNECT TO EXISTING SYSTEMS.; INTENDED BENEFICIARIES: THE INTENDED BENEFICIARIES OF THIS AWARD ARE THE RESIDENTS VISITORS EMPLOYEES AND EMPLOYERS IN AND AROUND THE THREE RIVERS REGIONAL COMMISSION COWETA COUNTY AND FORSYTH COUNTY ALL OF WHICH ARE PART OF THE ATLANTA UZA.; SUBRECIPIENT ACTIVITIES: THE ATLANTA-REGION TRANSIT LINK AUTHORITY (THE ATL) WILL BE SERVING AS THE DIRECT RECIPIENT OF FUNDING FOR THIS GRANT. THE THREE RIVERS REGIONAL COMMISSION COWETA COUNTY AND FORSYTH COUNTY WILL BE SUBRECIPIENTS OF THE ATL AND RECEIVE A SUB-ALLOCATION OF FUNDING FROM THE ATLANTA UZA FOR THIS AWARD. THREE SUBRECIPIENT PROJECTS ARE ADMINISTERED THROUGH THIS GRANT:- THREE RIVERS REGIONAL COMMISSION: SUPPORTING THE 5307-ELIGIBLE SERVICE WITHIN THE 7-COUNTY TRANSIT PROGRAM. THESE FUNDS WILL SUPPORT 5 REPLACEMENT BUSES AND CADAVL SOFTWARE 1 ADMINISTRATIVE NON-REVENUE VEHICLE COMPUTER HARDWARE AND RADIOS. - COWETA COUNTY: PROVIDES DEMAND RESPONSE SERVICE OPERATING ASSISTANCE EQUIPMENT AND PLANNING ACTIVITIES.THESE FUNDS WILL SUPPORT JARC OPERATING ASSISTANCE FOR STATE FISCAL YEAR (FY) 2025 AND 2026 IN ADDITION TO SHORT RANGE PLANNING CADAVL SOFTWARE AND RADIOS.- FORSYTH COUNTY: PROVIDES DEMAND RESPONSE SERVICES JOB ACCESS REVERSE COMMUTE OPERATING ASSISTANCE.THESE FUNDS WILL SUPPORT JARC OPERATING ASSISTANCE FOR CALENDAR YEAR 2024.
$2,209,815
FORMULA GRANT (A)
Feb 19, 2025
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
STATE OF GOOD REPAIR GRANTS PROGRAM
APPLICATION PURPOSE: THIS GRANT RECOGNIZES 5307 URBANIZED AREA FORMULA FUNDS 5337 HIGH INTENSITY MOTOR BUS FUNDS AND 5339A BUS AND BUS FACILITIES FORMULA FUNDS APPORTIONED TO THE ATLANTA URBANIZED AREA SUB-ALLOCATED TO THE GEORGIA REGIONAL TRANSPORTATION AUTHORITY AND TRANSFERRED TO THE ATLANTA-REGION TRANSIT LINK AUTHORITY. THE FY 2026 XPRESS PROGRAM GRANT PROJECTS INCLUDE FUNDS FOR THE FOLLOWING ITEMS:- FY 2021 THROUGH FY 2023 5307 URBANIZED AREA FORMULA FUNDS ($2599590 FROM FY 2021 $1953283 FROM FY 2022 AND $4133223 FROM FY 2023 TOTALING $8686096) WILL COVER THE FOLLOWING:- PREVENTIVE MAINTENANCE- CAPITAL COST OF CONTRACTING FOR VANPOOL- REGIONAL VANPOOL PROGRAM- REGIONAL MOBILITY MANAGEMENT- PROJECT ADMINISTRATION- SHORT RANGE TRANSIT PLANNING- FY 2021 5337 URBANIZED AREA FORMULA FUNDS TOTALING $2131508 OF WHICH $1031508 WILL SUPPORT PREVENTIVE MAINTENANCE AMONG PARK AND RIDE LOTS AND VEHICLES SUCH AS VEHICLE MAINTENANCE HVACS FACILITY REPAIRS AND BACKFLOW TESTING AND $1049964 FOR CAPITAL COST OF CONTRACTING FOR TRANSDEV AND $50036 FOR THE BUS WASH RENOVATION AT SOUTH OPS.- FY 2022 5339(A) BUS AND BUS FACILITIES FUNDS TOTALING $1049964 WHICH WILL SUPPORT THE BUS WASH RENOVATION AT SOUTH OPS.BOTH THE 1% SECURITY ALLOCATION REQUIREMENT AND THE 0.75% SAFETY ALLOCATION REQUIREMENT FOR 5307 FUNDS ARE ADDRESSED IN ALI 11.7A.00 - PREVENTATIVE MAINTENANCE. THE SERVICES PROVIDED BY THE 3RD PARTY CONTRACTOR INCLUDE MAINTENANCE OF SECURITY AND SAFETY RELATED SERVICES. THE ELIGIBLE CAPITAL ASSISTANCE ACTIVITIES ARE OUTLINED IN THE PROJECT DETAILS OF THE APPLICATION; ATL DOES NOT ANTICIPATE PURCHASING ANY CAPITAL EQUIPMENT IN EXCESS OF $10000 USING THESE FUNDS.THE SOURCE OF LOCAL MATCH FUNDING FOR XPRESS RELATED ACTIVITIES ORIGINATES FROM STATE APPROPRIATIONS.THE RECIPIENT OR SUB-RECIPIENT (WHEN APPLICABLE) WILL ENSURE CONTRACTORS PROCURED WILL NOT BE ON THE FTA SUSPENSION AND DEBARMENT LIST.THE RECIPIENT OR SUB-RECIPIENT (WHEN APPLICABLE) WILL FOLLOW ALL 3RD PARTY PROCUREMENT POLICIES AS DEFINED IN C4220.1F (THIRD PARTY CONTRACTING GUIDANCE).IN ADDITION TO FTAS BUY AMERICA ACT WHICH REQUIRES THAT THE STEEL IRON AND MANUFACTURED GOODS USED IN AN FTA-FUNDED PROJECT ARE PRODUCED IN THE UNITED STATES (49 U.S.C. 5323(J)(1)) THE BUILD AMERICA BUY AMERICA ACT (BABA) (PUBLIC LAW 117-58 DIV. G 70914(A)) NOW REQUIRES THAT CONSTRUCTION MATERIALS USED IN INFRASTRUCTURE PROJECTS ARE ALSO PRODUCED IN THE UNITED STATES. REFER TO TERMS AND CONDITIONS IN FTAS MASTER AGREEMENT SECTION 15. THE BABA REQUIREMENT APPLIES TO THIS GRANT IN ADDITION TO THE BUY AMERICA ACT EXCEPT TO THE EXTENT A WAIVER OF EITHER REQUIREMENTS MAY APPLY.; ACTIVITIES PERFORMED: XPRESS OPERATIONS MAINTENANCE AND PLANNING; EXPECTED OUTCOMES: IMPROVED SERVICE REDUCED CONGESTION DURING PEAK HOURS RELIABLE TRANSIT FOR SHIFT WORKERS; INTENDED BENEFICIARIES: COMMUTERS AND SHIFT WORKERS IN THE ATLANTA REGION AND SURROUNDING COUNTIES WITHIN ATL SERVICE AREA; SUBRECIPIENT ACTIVITIES: NONE
$11,984,685
FORMULA GRANT (A)
Aug 18, 2025
Habitat For Humanity International INC
285 Peachtree Center Ave Ne
Department of Housing and Urban Development / Assistant Secretary for Community Planning and Development
SELF-HELP HOMEOWNERSHIP OPPORTUNITY PROGRAM
PURPOSE: THE SELF-HELP HOMEOWNERSHIP OPPORTUNITY PROGRAM (SHOP) AWARDS GRANT FUNDS TO ELIGIBLE NATIONAL AND REGIONAL NONPROFIT ORGANIZATIONS AND CONSORTIA TO PURCHASE HOME SITES AND DEVELOP OR IMPROVE THE INFRASTRUCTURE NEEDED TO SET THE STAGE FOR SWEAT EQUITY AND VOLUNTEER-BASED HOMEOWNERSHIP PROGRAMS FOR LOW-INCOME PERSONS AND FAMILIES. SHOP FUNDS MUST BE USED FOR ELIGIBLE EXPENSES TO DEVELOP DECENT, SAFE, AND SANITARY NON-LUXURY HOUSING FOR LOW-INCOME PERSONS AND FAMILIES WHO OTHERWISE WOULD NOT BECOME HOMEOWNERS. HOMEBUYERS MUST BE WILLING TO CONTRIBUTE SIGNIFICANT AMOUNTS OF THEIR OWN SWEAT EQUITY TOWARD THE CONSTRUCTION OR REHABILITATION OF THEIR HOMES. PROJECT SUMMARIES CAN BE FOUND AT HTTPS://WWW.HUDEXCHANGE.INFO/PROGRAMS/SHOP/.; ACTIVITIES TO BE PERFORMED: SHOP GRANT FUNDS CAN ONLY BE USED FOR LAND ACQUISITION, INFRASTRUCTURE IMPROVEMENTS, AND ADMINISTRATIVE COSTS. TOTAL LAND ACQUISITION AND INFRASTRUCTURE IMPROVEMENT COSTS CANNOT EXCEED AN AVERAGE OF $25,000 IN SHOP ASSISTANCE PER UNIT. ADMINISTRATIVE COSTS CANNOT EXCEED 20 PERCENT OF THE SHOP GRANT AMOUNT. SHOP GRANTEES MUST LEVERAGE OTHER FUNDS FOR THE NEW CONSTRUCTION OR REHABILITATION OF THEIR SHOP UNITS.; EXPECTED OUTCOMES: EXPECTED OUTCOMES OF THE SHOP GRANT PROGRAM INCLUDE PROVIDING HOMES FOR LOW-INCOME PERSONS AND FAMILIES TO PURCHASE THROUGH AFFORDABLE FINANCING AND SWEAT EQUITY.; INTENDED BENEFICIARIES: INTENDED BENEFICIARIES OF SHOP GRANT FUNDS ARE LOW-INCOME INDIVIDUALS AND FAMILIES SEEKING HOMEOWNERSHIP.; SUBRECIPIENT ACTIVITIES: THE SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.
$2,057,772
PROJECT GRANT (B)
Oct 24, 2023
Habitat For Humanity International INC
285 Peachtree Center Ave Ne
Department of Housing and Urban Development / Office of Lead Hazard Control and Healthy Homes
LEAD HAZARD REDUCTION GRANT PROGRAM
PURPOSE: THE LEAD-BASED PAINT HAZARD REDUCTION (LHR) GRANT PROGRAM IS TO MAXIMIZE THE NUMBER OF CHILDREN UNDER THE AGE OF SIX PROTECTED FROM LEAD POISONING BY ASSISTING STATES, CITIES, COUNTIES/PARISHES, NATIVE AMERICAN TRIBES OR OTHER UNITS OF LOCAL GOVERNMENT IN UNDERTAKING COMPREHENSIVE PROGRAMS TO IDENTIFY AND CONTROL LEAD-BASED PAINT HAZARDS IN ELIGIBLE PRIVATELY-OWNED RENTAL OR OWNER-OCCUPIED HOUSING POPULATIONS. IN ADDITION, THERE IS HEALTHY HOMES SUPPLEMENTAL FUNDING AVAILABLE THAT IS INTENDED TO ENHANCE THE LEAD-BASED PAINT HAZARD CONTROL ACTIVITIES BY COMPREHENSIVELY IDENTIFYING AND ADDRESSING OTHER HOUSING HAZARDS THAT AFFECT OCCUPANT HEALTH. INFORMATION ABOUT WHERE THE SUPPLEMENTAL FUNDING CAN BE USED CAN BE FOUND AT. HTTPS://WWW.HUD.GOV/PROGRAM_OFFICES/HEALTHY_HOMES/PROJECT_DESCRIPTIONS; ACTIVITIES TO BE PERFORMED: PROGRAM FUNDS WILL BE AWARDED TO APPLICANTS TO ACCOMPLISH THE FOLLOWING OBJECTIVES: A. TARGETED UNITS: TARGET LEAD HAZARD CONTROL EFFORTS IN HOUSING UNITS WHERE CHILDREN LESS THAN 6 YEARS OF AGE ARE AT GREATEST RISK OF LEAD POISONING (PRE-1960, AND, ESPECIALLY, PRE-1940 CONSTRUCTION), WHICH HAS HISTORICALLY INCLUDED CHILDREN IN LOW-INCOME AND MINORITY NEIGHBORHOODS, TO REDUCE THE LIKELIHOOD OF ELEVATED BLOOD LEAD LEVELS IN THESE CHILDREN. B. COST EFFECTIVENESS: UTILIZE COST-EFFECTIVE LEAD HAZARD CONTROL METHODS AND APPROACHES THAT ENSURE THE LONG-TERM SAFETY OF THE BUILDING OCCUPANTS. C. CAPACITY: BUILD LOCAL CAPACITY OF TRAINED AND CERTIFIED INDIVIDUALS AND FIRMS TO ADDRESS LEAD HAZARDS SAFELY AND EFFECTIVELY DURING LEAD HAZARD CONTROL, RENOVATION, REMODELING, AND MAINTENANCE ACTIVITIES. ANOTHER CORE ELEMENT FOR CAPACITY INCLUDES THE DEVELOPMENT OF COMPREHENSIVE, COMMUNITY-BASED APPROACHES TO INTEGRATING THIS GRANT PROGRAM WITHIN OTHER LOCAL INITIATIVES THROUGH PUBLIC AND PRIVATE PARTNERSHIPS THAT ADDRESS HOUSING RELATED HEALTH AND SAFETY HAZARDS AND/OR SERVE LOW-INCOME FAMILIES WITH CHILDREN UNDER THE AGE OF SIX (6). D. AFFIRMATIVE MARKETING: ESTABLISH AND IMPLEMENT A DETAILED PROCESS OF MONITORING AND ENSURING THAT UNITS MADE LEAD-SAFE ARE AFFIRMATIVELY MARKETED, AND PRIORITY GIVEN, TO FAMILIES WITH CHILDREN UNDER AGE 6 YEARS FOR NOT LESS THAN THREE YEARS. E. DATA COLLECTION: GATHER PRE- AND POST-TREATMENT DATA THAT SUPPORTS AND VALIDATES LEAD HAZARD CONTROL INVESTMENTS. PROGRAM DATA COLLECTED SHOULD SUPPORT THE EVALUATION OF GRANT PROGRAM ACTIVITIES AND OUTCOMES. F. TARGETED OUTREACH AND EDUCATION: CONDUCTING TARGETED OUTREACH, AFFIRMATIVE MARKETING, EDUCATION OR OUTREACH PROGRAMS ON LEAD HAZARD CONTROL AND LEAD POISONING PREVENTION DESIGNED TO INCREASE THE ABILITY OF THE APPLICANT TO DELIVER THE SPECIFIED LEAD HAZARD CONTROL SERVICES THROUGH THIS PROGRAM; INCLUDING EDUCATING OWNERS OF ELIGIBLE RENTAL PROPERTIES, TENANTS, AND OTHERS ON THE BENEFITS AND EXPECTATIONS OF PARTICIPATING IN THIS PROGRAM PROVIDED BY "TITLE X" OF THE RESIDENTIAL LEAD-BASED PAINT HAZARD REDUCTION ACT OF 1992.; EXPECTED OUTCOMES: TO IDENTIFY AND CLEAN UP DANGEROUS LEAD IN LOW-INCOME FAMILIES’ HOMES WHERE LOW-INCOME FAMILIES WERE CHILDREN 6 AND UNDER RESIDE. THESE INVESTMENTS WILL PROTECT FAMILIES AND CHILDREN BY TARGETING SIGNIFICANT LEAD AND HEALTH HAZARDS IN OVER 3,700 LOW-INCOME HOMES FOR WHICH OTHER RESOURCES ARE NOT AVAILABLE.; INTENDED BENEFICIARIES: TO ASSIST STATES, CITIES, COUNTIES/PARISHES, NATIVE AMERICAN TRIBES OR OTHER UNITS OF LOCAL GOVERNMENT IN UNDERTAKING COMPREHENSIVE PROGRAMS TO IDENTIFY AND CONTROL LEAD-BASED PAINT HAZARDS IN ELIGIBLE PRIVATELY-OWNED RENTAL OR OWNER-OCCUPIED HOUSING POPULATIONS WERE CHILDREN UNDER 6 RESIDE.; SUBRECIPIENT ACTIVITIES: THE SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.
$2,000,000
PROJECT GRANT (B)
Feb 4, 2025
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
BUSES AND BUS FACILITIES FORMULA, COMPETITIVE, AND LOW OR NO EMISSIONS PROGRAMS
APPLICATION PURPOSE: THIS GRANT RECOGNIZES 5307 URBANIZED AREA FORMULA FUNDS 5337 HIGH INTENSITY MOTOR BUS FUNDS AND 5339A BUS AND BUS FACILITIES FORMULA FUNDS APPORTIONED TO THE ATLANTA URBANIZED AREA SUB-ALLOCATED TO THE GEORGIA REGIONAL TRANSPORTATION AUTHORITY AND TRANSFERRED TO THE ATLANTA-REGION TRANSIT LINK AUTHORITY. THE FY 2026 XPRESS PROGRAM GRANT PROJECTS INCLUDE FUNDS FOR THE FOLLOWING ITEMS:- FY 2021 THROUGH FY 2023 5307 URBANIZED AREA FORMULA FUNDS ($2599590 FROM FY 2021 $1953283 FROM FY 2022 AND $4133223 FROM FY 2023 TOTALING $8686096) WILL COVER THE FOLLOWING:- PREVENTIVE MAINTENANCE- CAPITAL COST OF CONTRACTING FOR VANPOOL- REGIONAL VANPOOL PROGRAM- REGIONAL MOBILITY MANAGEMENT- PROJECT ADMINISTRATION- SHORT RANGE TRANSIT PLANNING- FY 2021 5337 URBANIZED AREA FORMULA FUNDS TOTALING $2131508 OF WHICH $1031508 WILL SUPPORT PREVENTIVE MAINTENANCE AMONG PARK AND RIDE LOTS AND VEHICLES SUCH AS VEHICLE MAINTENANCE HVACS FACILITY REPAIRS AND BACKFLOW TESTING AND $1049964 FOR CAPITAL COST OF CONTRACTING FOR TRANSDEV AND $50036 FOR THE BUS WASH RENOVATION AT SOUTH OPS.- FY 2022 5339(A) BUS AND BUS FACILITIES FUNDS TOTALING $1049964 WHICH WILL SUPPORT THE BUS WASH RENOVATION AT SOUTH OPS.BOTH THE 1% SECURITY ALLOCATION REQUIREMENT AND THE 0.75% SAFETY ALLOCATION REQUIREMENT FOR 5307 FUNDS ARE ADDRESSED IN ALI 11.7A.00 - PREVENTATIVE MAINTENANCE. THE SERVICES PROVIDED BY THE 3RD PARTY CONTRACTOR INCLUDE MAINTENANCE OF SECURITY AND SAFETY RELATED SERVICES. THE ELIGIBLE CAPITAL ASSISTANCE ACTIVITIES ARE OUTLINED IN THE PROJECT DETAILS OF THE APPLICATION; ATL DOES NOT ANTICIPATE PURCHASING ANY CAPITAL EQUIPMENT IN EXCESS OF $10000 USING THESE FUNDS.THE SOURCE OF LOCAL MATCH FUNDING FOR XPRESS RELATED ACTIVITIES ORIGINATES FROM STATE APPROPRIATIONS.THE RECIPIENT OR SUB-RECIPIENT (WHEN APPLICABLE) WILL ENSURE CONTRACTORS PROCURED WILL NOT BE ON THE FTA SUSPENSION AND DEBARMENT LIST.THE RECIPIENT OR SUB-RECIPIENT (WHEN APPLICABLE) WILL FOLLOW ALL 3RD PARTY PROCUREMENT POLICIES AS DEFINED IN C4220.1F (THIRD PARTY CONTRACTING GUIDANCE).IN ADDITION TO FTAS BUY AMERICA ACT WHICH REQUIRES THAT THE STEEL IRON AND MANUFACTURED GOODS USED IN AN FTA-FUNDED PROJECT ARE PRODUCED IN THE UNITED STATES (49 U.S.C. 5323(J)(1)) THE BUILD AMERICA BUY AMERICA ACT (BABA) (PUBLIC LAW 117-58 DIV. G 70914(A)) NOW REQUIRES THAT CONSTRUCTION MATERIALS USED IN INFRASTRUCTURE PROJECTS ARE ALSO PRODUCED IN THE UNITED STATES. REFER TO TERMS AND CONDITIONS IN FTAS MASTER AGREEMENT SECTION 15. THE BABA REQUIREMENT APPLIES TO THIS GRANT IN ADDITION TO THE BUY AMERICA ACT EXCEPT TO THE EXTENT A WAIVER OF EITHER REQUIREMENTS MAY APPLY.; ACTIVITIES PERFORMED: XPRESS OPERATIONS MAINTENANCE AND PLANNING; EXPECTED OUTCOMES: IMPROVED SERVICE REDUCED CONGESTION DURING PEAK HOURS RELIABLE TRANSIT FOR SHIFT WORKERS; INTENDED BENEFICIARIES: COMMUTERS AND SHIFT WORKERS IN THE ATLANTA REGION AND SURROUNDING COUNTIES WITHIN ATL SERVICE AREA; SUBRECIPIENT ACTIVITIES: NONE
$11,984,685
FORMULA GRANT (A)
Aug 18, 2025
Habitat For Humanity International INC
285 Peachtree Center Ave Ne
Department of Housing and Urban Development / Assistant Secretary for Community Planning and Development
VETERANS HOUSING REHABILITATION AND MODIFICATION PROGRAM
PURPOSE: THE VETERANS HOUSING REHABILITATION AND MODIFICATION PILOT PROGRAM (VHRMP) AWARDS GRANT FUNDS TO ORGANIZATIONS WHO MUST PROVIDE NATIONWIDE OR STATEWIDE PROGRAMS WHICH PRIMARILY SERVE LOW-INCOME VETERANS LIVING WITH DISABILITIES WHO NEED ADAPTIVE HOUSING TO HELP THEM REGAIN OR MAINTAIN THEIR INDEPENDENCE. THROUGH THE VHRMP PROGRAM, GRANTEES WILL MAKE NECESSARY PHYSICAL MODIFICATIONS TO ADDRESS THE ADAPTIVE HOUSING NEEDS OF ELIGIBLE VETERANS, INCLUDING WHEELCHAIR RAMPS, WIDENING EXTERIOR AND INTERIOR DOORS, RECONFIGURING, AND REEQUIPPING BATHROOMS, OR ADDING A BEDROOM OR BATHROOM FOR THE VETERAN. PROJECT SUMMARIES CAN BE FOUND AT HTTPS://WWW.HUDEXCHANGE.INFO/PROGRAMS/RURAL/VETERANS-HOUSING-REHABILITATION-AND-MODIFICATION-PILOT-PROGRAM/. ; ACTIVITIES TO BE PERFORMED: THE FUNDING MAY BE USED TO MODIFY OR REHABILITATE ELIGIBLE VETERANS’ PRIMARY RESIDENCES TO ALLOW EASE OF MOBILITY IN, AROUND, AND OUT OF THE HOME, REDUCE POSSIBILITY OF FALLING, PROVIDE LIVING QUARTERS FOR A FAMILIAL CAREGIVER, ASSIST WITH UTILITY COSTS, INSTALL ENERGY EFFICIENT FEATURES AND EQUIPMENT, AND REMEDY INTERIOR OR EXTERIOR HOME FEATURES TO ELIMINATE SAFETY HAZARDS. FUNDS CAN ALSO BE USED TO PROVIDE GRANTEES’ AFFILIATES WITH TECHNICAL, ADMINISTRATIVE, AND TRAINING SUPPORT IN CONNECTION WITH THOSE SERVICES. PROJECT SUMMARIES CAN BE FOUND AT: HTTPS://WWW.HUDEXCHANGE.INFO/PROGRAMS/RURAL/VETERANS-HOUSING-REHABILITATION-AND-MODIFICATION-PILOT-PROGRAM/. ; EXPECTED OUTCOMES: THE EXPECTED OUTCOMES FOR VHRMP FUNDS INCLUDE THE INCREASING ACCESSIBILITY, ENERGY EFFICIENCY, AND SAFETY OF ELIGIBLE BENEFICIARIES’ HOMES. SINCE FY 2018, HUD HAS MADE 25 AWARDS THROUGH NOTICE OF FUNDING OPPORTUNITIES WHICH HAS RESULTED IN AWARDING $24 MILLION TO NATIONWIDE OR STATEWIDE NONPROFIT ORGANIZATIONS THAT PRIMARILY SERVE VETERANS AND LOW-INCOME INDIVIDUALS. GRANTEES HAVE COMMITTED $13 MILLION OF MATCHING AND $9 MILLION IN LEVERAGING. CURRENTLY, 1,753 VETERAN HOMES ARE PROJECTED TO BE REHABILITATED AND/OR MODIFIED. GRANTEES HAVE COMPLETED APPROXIMATELY 275 PROJECTS. IN TERMS OF COSTS SAVED, UTILITY SAVINGS WERE CITED MOST BY THE GRANTEES. FOR EXAMPLE, ONE GRANTEE REPORTS 38 PERCENT OF CLIENTS HAVE SAID THEIR UTILITY BILLS HAVE DECREASED SINCE THE REPAIRS HAVE BEEN MADE. OTHER CITED MOBILITY BENEFITS INCLUDE: 76% PERCENT OF CLIENTS NOTED THAT THE REPAIRS MADE IT EASIER FOR THEM TO ENTER AND EXIT THEIR HOME;74% PERCENT OF CLIENTS SAID THAT IT IS EASIER TO BREATHE IN THEIR HOME SINCE THE REPAIRS HAVE BEEN MADE; 84 PERCENT OF CLIENTS SAID THEIR PHYSICAL AND MENTAL HEALTH HAS IMPROVED SINCE THE REPAIRS HAVE BEEN MADE; AND 63 PERCENT OF CLIENTS HAVE SAID THAT THE COST FOR HOME MAINTENANCE HAS DECREASED SINCE THE REPAIRS. ; INTENDED BENEFICIARIES: THE INTENDED BENEFICIARIES OF THIS PROGRAM ARE LOW-INCOME AND DISABLED ELIGIBLE VETERANS. THE TERM "ELIGIBLE VETERAN" MEANS A VETERAN AS DEFINED BY 38 U.S.C. 101 WHOSE INCOME IS LESS THAN 80 PERCENT OF THE MEDIAN INCOME FOR AN AREA, AS DETERMINED BY THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECRETARY, AND HAS A DISABILITY AS DEFINED UNDER SECTION 3 OF THE AMERICANS WITH DISABILITIES ACT (42 U.S.C. 12102). ; SUBRECIPIENT ACTIVITIES: THE SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.
$1,000,000
PROJECT GRANT (B)
Feb 22, 2024
Georgia Regional Transportation Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
FEDERAL TRANSIT CAPITAL INVESTMENT GRANTS
BUDGET REVISION #2:THIS REVISION WILL CREATE A NEW ACTIVITY LINE ITEM (ALI) 11.12.07 - BUY REPLACEMENTS - BUS COMMUTER WHICH WILL ALLOW FOR THE PURCHASE OF 15 MCI D4500S TO COMPLETE THE REPLACEMENT OF THE 2009 MODEL YEAR COACHES. FUNDING FROM 11.13.07 AND 11.33.04 WILL BE USED TO CREATE 11.12.07; NO ADDITIONAL FUNDING IS BEING REQUESTED.ADDITIONALLY TWO ALIS 11.71.10 - INSPECTION SERVICES AND 11.73.00 - CONTINGENCIES/PROGRAM RESERVE WILL HAVE THEIR TOTAL AND LOCAL SHARES REDUCED IN ORDER TO BE AT AN 80% FEDERAL 20% LOCAL SHARE. THE FEDERAL AMOUNT REQUESTED WILL NOT CHANGE.ALL OTHER LANGUAGE REMAINS APPLICABLE.BUDGET REVISION #1:THIS BUDGET REVISION ADJUSTS THE BUDGET WITHIN EXISTING SCOPES AND CREATES NEW SCOPES WITHIN THE AWARD TO BETTER UTILIZE THE REMAINING $16.91 MILLION IN FEDERAL FUNDING. THE ADDITIONAL SCOPES INCLUDE PROJECT ACTIVITIES THAT SUPPORT THE ACTIVITIES AT THE HICKORY GROVE ROAD AND TOWN CENTER PARK-AND-RIDE LOTS ALONG THE I-75 NORTHWEST CORRIDOR AND THE PURCHASE OF 15 BUSES TO SUPPORT EXPANDED SERVICE IN THE NORTHWEST CORRIDOR MANAGED LANES. THE ATLANTA CONGESTION REDUCTION DEMONSTRATION (CRD) PROJECT CREATED GEORGIAS FIRST EXPRESS LANES IN THE I-85 NORTH CORRIDOR IN 2011 AND TRANSIT HAS PLAYED A KEY ROLE IN MAXIMIZING THE EFFICIENCY AND UTILIZATION OF THOSE LANES. FOR EXAMPLE A GEORGIA TECH STUDY FOUND THAT ALTHOUGH EXPRESS BUSES CONSTITUTE ONLY 1.2% OF THE VEHICLES THEY CARRY 26% OF THE PEOPLE USING THE I-85 EXPRESS LANES DURING THE PEAK COMMUTING HOURS.IN 2014 SUBSEQUENT CRD PROJECTS WERE PLACED ON HOLD FOLLOWING THE DEFEAT OF THE REGIONAL T-SPLOST REFERENDUM IN METRO ATLANTA AND REMAINED ON HOLD PENDING THE COMPLETION OF A COMPREHENSIVE OPERATIONS ANALYSIS (COA) OF THE XPRESS COMMUTER SERVICE. BASED ON THE RECOMMENDATIONS CONTAINED IN THE COA GRTA HAS BEGUN COORDINATING TRANSIT SERVICE WITH THE STATE ROAD AND TOLLWAY AUTHORITY (SRTA) AND THE NEW EXPRESS LANE PROJECTS. THE FUNCTIONAL CONSOLIDATION OF GRTA AND SRTA HAS FACILITATED THE INTEGRATION OF EXPRESS LANE PROJECTS WITH XPRESS TRANSIT SERVICE PROJECTS. FUNDING THE NEW AND EXPANDED TRANSIT SERVICE PROJECTS THROUGH GRANT NO. GA-04-0019 IS THE CRITICAL NEW PHASE IN THE INTEGRATION.GRTA INTENDS TO UTILIZE THE REMAINING FUNDS IN GRANT NO. GA-04-0019 WITH ADDITIONAL STATE FUNDING TO:1) DESIGN AND CONSTRUCT A NEW PARK-AND-RIDE FACILITY WITH APPROXIMATELY 522-SPACES FOR NEW SERVICE AT THE NORTHWEST CORRIDOR EXPRESS LANES ACCESS POINT AT HICKORY GROVE ROAD IN COBB COUNTY ON LAND OWNED BY THE GEORGIA DEPARTMENT OF TRANSPORTATION (GDOT) (TIP REFERENCE PG. 173 CO-402).2) DESIGN AND CONSTRUCT A 200-SPACE EXPANSION OF THE EXISTING 520-SPACE TOWN CENTER PARK-AND-RIDE FACILITY NEAR THE NORTHWEST CORRIDOR EXPRESS LANES ACCESS POINT AT BIG SHANTY ROAD IN COBB COUNTY (TIP REFERENCE PG. 118 AR-604).3) PURCHASE 15 NEW XPRESS COMMUTER COACHES TO SUPPORT EXPANDED SERVICE AT THE PARK-AND-RIDE LOTS IN THE NORTHWEST CORRIDOR EXPRESS LANES (TIP REFERENCE PG. 73 AR-375E).THE RELATED TIP PAGES ARE ATTACHED TO THIS APPLICATION IN THE APPLICATION DOCUMENTS SECTION.ORIGINAL GRANT:THIS IS A FY 2009 SECTION 5309 APPLICATION FOR $29703367 IN FEDERAL ASSISTANCE FOR PROJECTS AS PART OF THE ATLANTA CONGESTION REDUCTION AND DEMONSTRATION PROJECT (CRD). THIS APPLICATION WILL SERVE AS APPLICATION 2 OF 3 FOR EXPANSION OF THE GRTA XPRESS COMMUTER BUS SYSTEM AS PART OF THE ATLANTA CRD. THIS GRANT APPLICATION INCLUDES THE TRANSIT FACILITIES AND EQUIPMENT THAT WILL DIRECTLY SUPPORT THE CONVERSION OF THE I-85 NORTH HOV TO HOT PROJECT AS WELL AS RELATED WORK FOR FOUR PARK AND RIDE LOTS ELSEWHERE IN THE ATLANTA REGION. THE I-85 NORTH EXPRESS TRANSIT SERVICES WILL BE DOUBLED THROUGH THE IMPLEMENTATION OF THIS GRANT. ATTACHED IS A COMPARISON OF THE I-85 NORTH XPRESS TRANSIT SERVICES BEFORE PROJECT WITH THE PROJECTED RESULTS FOLLOWING IMPLEMENTATION OF THE PROJECT. TWO OF THE PARK AND RIDE LOTS (HAMILTON MILL AND CEDARS ROAD) INCLUDED IN THE APPLICATION ARE PROJECTS THAT DIRECTLY SERVE THE I-85 NORTH HOV TO HOT PROJECT. THE HAMILTON MILL LOT WILL ADD APPROXIMATELY 1200 PARKING SPACES AND 900 SPACES ARE NOW PLANNED AT CEDARS ROAD. THESE FACILITIES ALONG WITH THE EXPANSION OF THE I-985 / GA 20 PARK N RIDE LOT WILL DOUBLE THE COMMUTER PARK AND RIDE SPACES IN THE CORRIDOR. THE FOLLOWING PROJECTS WITH FEDERAL AMOUNTS ARE REFLECTED IN THIS APPLICATION:ACQUIRE COMMUTER BUS FOR EXPANSION $ 14400000 (36 MCI COMMUTER COACHES 3RD PARTY INSPECTION SERVICES ACQUIRE MOBILE FARE COLLECTION EQUIPMENT AND PROJECT ADMINISTRATION) HAMILTON MILL PARK N RIDE LOT - $6946267 (ENGINEERING/DESIGN LAND ACQUISITION CONSTRUCTION SURVEILLANCE AND SECURITY SYSTEMS MISCELLANEOUS STATION EQUIPMENT AND PROJECT ADMINISTRATION). CEDARS ROAD PARK AND RIDE LOT - $ 6087100 (ENGINEERING /DESIGN CONSTRUCTION SURVEILLANCE AND SECURITY EQUIPMENT MISCELLANEOUS STATION EQUIPMENT AND PROJECT ADMINISTRATION)JODECO ROAD PARK N RIDE LOT - $ 2070000 (ENGINEERING /DESIGN LAND ACQUISITION CONSTRUCTION SURVEILLANCE AND SECURITY EQUIPMENT MISCELLANEOUS STATION EQUIPMENT AND PROJECT ADMINISTRATION)SALEM ROAD NORTH CHEROKEE AND SOUTH CHEROKEE PARK N RIDE LOT - $ 200000 (ENGINEERING DESIGN AND PROJECT ADMINISTRATION)THE PROJECT SCHEDULE IS ATTACHED TO THE PROJECT INFORMATION ALONG WITH AN ENVIRONMENTAL SPREADSHEET DETAILING THE DOCUMENTED CE APPROVAL DATES APPRAISAL DATES AND LNOP APPROVAL DATES. PHASE I TRANSIT PROJECT MUST BE IN OPERATION NO LATER THAN JULY 31 2012.THE ATLANTA CRD AGREEMENT (ATTACHED) WITH USDOT INCLUDES TOTAL OF $97.5 MILLION OF FTA FUNDS FOR DIRECT AND INDIRECT TRANSIT IMPROVEMENT TO BE ALLOCATED AS FOLLOWS: $28.8 MILLION FROM THE USDOT FEDERAL TRANSIT ADMINISTRATION (FTA) SECTION 5309 BUS AND BUS FACILITIES PROGRAM FOR TRANSIT IMPROVEMENTS. .$29.2 MILLION FROM THE USDOT FTA SECTION 5309 BUS AND BUS FACILITIES PROGRAM FOR THE PURCHASE OF 36 COMMUTER COACHES AND THE CONSTRUCTION OR EXPANSION OF UP TO 3 PARK-AND-RIDE LOTS FOR USE AND ALONG THE I-85 CORRIDOR FROM I-285 TO OLD PEACHTREE ROAD IN GWINNETT COUNTY. $39.5 MILLION FROM THE USDOT FTA SECTION 5309 (BUS AND BUS FACILITIES FIXED GUIDEWAY MODERNIZATION AND NEW STARTS) PROGRAMS FOR TRANSIT IMPROVEMENTS. THE TOTAL FEDERAL GRANT DOLLARS IN THIS APPLICATION IS $ 29703367 AND INCLUDES THE ABOVE PROJECTS LISTED IN THE 2008-2013 TIP ADMINISTRATIVE MODIFICATIONS APPROVED ON JUNE 30 2009; INCORPORATED BY REFERENCE IN APPENDIX D OF STIP. THE PROJECT MATCH WILL BE PROVIDED FOR BY GO BOND FUNDS. THIS PROJECT IS RELATED TO GWINNETT COUNTY EXISTING GRANTS GA-90-X218 AND GA-03-0071. FUNDS FROM THESE GRANTS WILL PROVIDE FOR THE CEDARS ROAD OPERATING FACILITY AS WELL AS CONSTRUCTION OF THE ADDITIONAL SPACES IN THE I-985 / GA 20 PARK AND RIDE LOT.
PROJECT GRANT (B)
Mar 11, 2025
Georgia Regional Transportation Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
FEDERAL TRANSIT FORMULA GRANTS
AMENDMENT #1:THIS GRANT AMENDMENT REQUESTS FEDERAL FY15 5307 URBANIZED AREA FORMULA FUNDS IN THE AMOUNT OF $850000 AND FEDERAL FY16 5307 URBANIZED AREA FORMULA FUNDS IN THE AMOUNT OF $200000 APPORTIONED TO THE ATLANTA URBANIZED AREA AND SUB-ALLOCATED TO GEORGIA REGIONAL TRANSPORTATION AUTHORITY FOR ELIGIBLE PLANNING ACTIVITIES. THE TOTAL FUNDING FOR THE GRANT IS $1962000 WITH $572255 IN FEDERAL FY13 FUNDS $339745 IN FEDERAL FY14 FUNDS $850000 IN FEDERAL FY15 FUNDS AND $200000 IN FEDERAL FY16 FUNDS. STATE FUNDS WILL BE USED AS THE SOURCE OF LOCAL MATCH FOR THIS APPLICATION.THIS APPLICATION FOR SECTION 5307 FEDERAL ASSISTANCE IS CONSISTENT WITH THE SUBALLOCATION IDENTIFIED IN THE DESIGNATED RECIPIENT SUB-ALLOCATION LETTERS DATED OCTOBER 9 2015 AND MARCH 28 2017. GRTAS 5307 BALANCE AS OF MARCH 2017 IS ATTACHED TO THIS APPLICATION. THE PROJECT IS LISTED AS INDICATED IN THE 2017 PROGRAM OF PROJECTS (POP) AND INCORPORATED INTO THE STIP BY REFERENCE.THE ELIGIBLE PLANNING ACTIVITIES ARE OUTLINED IN THE PROJECT DETAILS OF THE APPLICATION. GRTA HAS ATTACHED THE 2017 ATLANTA REGION UPWP SUBMISSION DOCUMENT TO THIS GRANT APPLICATION FOR REFERENCE. GRTA DOES NOT ANTICIPATE PURCHASING ANY CAPITAL EQUIPMENT IN EXCESS OF $5000 USING THESE FUNDS. AMENDMENT START DATE IS THE DATE OF AMENDMENT AWARD. THE OVERALL AWARD END DATE IS JUNE 30 2018. THE GRANT DOES NOT REQUEST FUNDS FOR THE USE OF RESEARCH AND DEVELOPMENT. GRTA (THE GRANTEE) WILL APPLY ITS INDIRECT COST RATE TO ELIGIBLE GRANT ACTIVITIES WITHIN THIS GRANT. GRTA WILL BE USING A COST ALLOCATION PLAN (CAP) TO CHARGE FOR INDIRECT COSTS. THE CAP IS ATTACHED TO THE GRANT APPLICATION ALONG WITH THE APPROVAL LETTER FROM FTA.THE METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY (MARTA) IS THE DESIGNATED RECIPIENT IN THE ATLANTA UZA AND GRTA IS A DIRECT RECIPIENT RECIPIENT ID#5891.ORIGINAL GRANT:THIS GRANT APPLICATION REQUESTS FEDERAL FY13 AND FY14 5307 URBANIZED AREA FORMULA FUNDS IN THE AMOUNT OF $912000 APPORTIONED TO THE ATLANTA URBANIZED AREA AND SUB-ALLOCATED TO GEORGIA REGIONAL TRANSPORTATION AUTHORITY FOR ELIGIBLE PLANNING ACTIVITIES. GRTA IS REQUESTING $572255 IN FEDERAL FY13 FUNDS AND $339745 IN FEDERAL FY14 FUNDS. THE ELIGIBLE PLANNING ACTIVITIES ARE OUTLINED IN THE PROJECT DETAILS OF THE APPLICATION. GRTA HAS ATTACHED THE 2016 ATLANTA REGION UPWP DOCUMENT TO THIS GRANT APPLICATION FOR REFERENCE. GRTA DOES NOT ANTICIPATE PURCHASING ANY CAPITAL EQUIPMENT IN EXCESS OF $5000 USING THESE FUNDS. THE OVERALL AWARD START DATE IS JUNE 1 2015 AND THE AWARD END DATE IS JUNE 30 2017. THE GRANT DOES NOT REQUEST FUNDS FOR THE USE OF RESEARCH AND DEVELOPMENT. GRTA (THE GRANTEE) WILL APPLY ITS INDIRECT COST RATE TO ELIGIBLE GRANT ACTIVITIES WITHIN THIS GRANT. THE METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY (MARTA) IS THE DESIGNATED RECIPIENT IN THE ATLANTA UZA AND GRTA IS A DIRECT RECIPIENT RECIPIENT ID#5891.
$1,962,000
FORMULA GRANT (A)
May 28, 2025
Georgia Regional Transportation Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
FEDERAL TRANSIT FORMULA GRANTS
APPLICATION PURPOSE: AMENDMENT 2THIS AMENDMENT IS THE SECOND STEP OF A TWO-STEP DEOBLIGATION/REOBLIGATION PROCESS IN ORDER TO TRANSFER FUNDS FROM CAPITAL TO OPERATING. AMENDMENT 1 REDUCED CARES ACT FEDERAL FUNDS BY $5731752 AND AMENDMENT 2 INCREASES CARES ACT FEDERAL FUNDS BY $5731752. AMENDMENT 1 REFERENCES MOVING $250000 FOR PLANNING BUT THIS AMENDMENT ELIMINATES THIS CHANGE AND INSTEAD RE-OBLIGATES ALL FUNDS TO OPERATIONS. THE DETAILED ALI CHANGES FOLLOW.AMENDMENT 1 (DEOBLIGATION OF FUNDS TOTALING $5731752) 11.12.01 BUY REPLACEMENT 40 FT BUS: REDUCE BY $1200000 11.33.04 CONSTRUCT BUS PARK AND RIDE LOT: REDUCE BY $3500000 11.33.20 CONSTRUCT MISC BUS STATION EQUIPMENT: REDUCE BY $531752 11.79.00 PROJECT ADMINISTRATION: REDUCE BY $500000AMENDMENT 2 (REOBLIGATION OF FUNDS TOTALING $5731752) 30.09.08 EMERGENCY RELIEF OPERATING ASSISTANCE: INCREASE BY $5731752AMENDMENT 1THIS AMENDMENT IS THE FIRST STEP OF A TWO-STEP DEOBLIGATION/REOBLIGATION PROCESS IN ORDER TO TRANSFER FUNDS FROM CAPITAL TO OPERATING AND PLANNING. AMENDMENT 1 REDUCES CARES ACT FEDERAL FUNDS BY $5731752. AFTER THIS AMENDMENT IS PROCESSED A SUBSEQUENT AMENDMENT TO INCREASE FUNDS BY $5731752 WILL BE SUBMITTED. THE DETAILED ALI CHANGES FOLLOW.AMENDMENT 1 (DEOBLIGATION OF FUNDS TOTALING $5731752) 11.12.01 BUY REPLACEMENT 40 FT BUS: REDUCE BY $1200000 11.33.04 CONSTRUCT BUS PARK AND RIDE LOT: REDUCE BY $3500000 11.33.20 CONSTRUCT MISC BUS STATION EQUIPMENT: REDUCE BY $531752 11.79.00 PROJECT ADMINISTRATION: REDUCE BY $500000AMENDMENT 2 (REOBLIGATION OF FUNDS TOTALING $5731752) 30.09.08 EMERGENCY RELIEF OPERATING ASSISTANCE: INCREASE BY $5481752 44.24.00 SHORT RANGE TRANSIT PLANNING: INCREASE BY $250000; ACTIVITIES PERFORMED: OPERATING ASSISTANCE ACTIVITIES WILL BE PERFORMED WITH FUNDING FROM THIS GRANT.; EXPECTED OUTCOMES: THE OUTCOMES OF THIS FUNDING WILL ASSIST WITH PROVIDING XPRESS COMMUTER BUS SERVICES ACROSS THE REGION.; INTENDED BENEFICIARIES: XPRESS COMMUTER BUS RIDERS WILL BENEFIT FROM THIS PROJECT.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENT ACTIVITIES ASSOCIATED.
$25,731,752
FORMULA GRANT (A)
Jul 2, 2025
Georgia Regional Transportation Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
FEDERAL TRANSIT FORMULA GRANTS
AMENDMENT #1:THE AMENDMENT REQUESTS TO TRANSFER $2000000 IN FEDERAL FUNDS FROM THE 11.13.07 - BUY COMMUTER BUS FOR EXPANSION ALI TO THE 11.33.04 - CONSTRUCT BUS PARK AND RIDE LOT ALI WHICH IS A NEW ALI AND SCOPE FOR THE GRANT.THIS GRANT APPLICATION REQUESTS TO USE FEDERAL HIGHWAY ADMINISTRATION (FHWA) 5307 URBANIZED AREA FORMULA FLEX FUNDING APPORTIONED TO THE ATLANTA URBANIZED AREA AND SUB-ALLOCATED TO THE GEORGIA REGIONAL TRANSPORTATION AUTHORITY TO BE USED FOR CONSTRUCTION COSTS ASSOCIATED WITH THE SUGARLOAF PARK AND RIDE LOT. THE AMENDMENT ALSO REQUESTS TO UPDATE THE MATCHING FUNDS TO INCLUDE $500000 OF UP TO $3300000 OF A LOCAL IN-KIND CONTRIBUTION FOR THE SUGARLOAF PARK AND RIDE PROPERTY. AN ADDITIONAL $2624215 IN IN-KIND CONTRIBUTION FROM THE APPRAISED PROPERTY WILL BE USED AS LOCAL IN-KIND CONTRIBUTION FOR AMENDMENT GA-2018-024-02 TOTALING $3124215 ACROSS THE TWO GRANTS. BOTH APPLICATIONS WILL SUPPORT CONSTRUCTION OF THE SAME PR EXPANSION AT SUGARLOAF. THE APPRAISAL APPRAISAL REVIEW AND THE FTA CONCURRENCE WHICH SUPPORT THE VALUATION OF THE SUGARLOAF PARK AND RIDE PROPERTY ARE ATTACHED.ORIGINAL BUDGET: THIS GRANT APPLICATION REQUESTS $2000000 FISCAL YEAR 2017 FEDERAL HIGHWAY ADMINISTRATION CMAQ FUNDS APPORTIONED TO THE ATLANTA URBANIZED AREA TRANSFERRED TO THE FEDERAL TRANSIT ADMINISTRATION AND ALLOCATED TO GEORGIA REGIONAL TRANSPORTATION AUTHORITY FOR THE FOLLOWING CAPITAL ASSISTANCE PROJECTS. MATCHING FUNDS WILL COME FROM STATE APPROPRIATIONS FROM THE STATE OF GEORGIA. THE NEW BUSES PURCHASED WITH FUNDS FROM THIS GRANT WILL BE SUBJECT TO THE AMERICANS WITH DISABILITIES ACT (ADA) REQUIREMENTS.THIS GRANT APPLICATION WILL PROVIDE FUNDING FOR THE XPRESS BUS PURCHASE FOR EXPANDED SERVICE IN THE MANAGED LANES. SPECIFICALLY THIS GRANT WILL PURCHASE UP TO FOUR 45 OVER THE ROAD COMMUTER COACHES THAT WILL ALLOW XPRESS TO PROVIDE EXPANDED COMMUTER BUS SERVICE IN THE MANAGED LANES CORRIDORS. THE NEW COACHES WILL HAVE A USEFUL LIFE OF 12 YEARS OR 500000 MILES WHICHEVER METRIC IS MET FIRST. GRTAS AWARD LETTER IS ATTACHED TO THIS APPLICATION. THE PROJECT IS LISTED AS INDICATED UNDER ARC FY2016-2021 TIP AMENDMENT #2. ARC FY2016-2021 TIP AMENDMENT #2 DOCUMENTATION HAS BEEN ATTACHED TO THIS APPLICATION. THE OVERALL AWARD START DATE IS THE DATE OF AWARD AND THE AWARD END DATE IS SEPTEMBER 30 2019. THE GRANT DOES NOT REQUEST FUNDS FOR THE USE OF RESEARCH AND DEVELOPMENT. GRTA (THE GRANTEE) WILL NOT APPLY ITS INDIRECT COST RATE TO ELIGIBLE GRANT ACTIVITIES WITHIN THIS GRANT.THE METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY (MARTA) IS THE DESIGNATED RECIPIENT IN THE ATLANTA UZA AND GRTA IS A DIRECT RECIPIENT RECIPIENT ID#5891.
$2,000,000
FORMULA GRANT (A)
Apr 2, 2024
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
BUSES AND BUS FACILITIES FORMULA, COMPETITIVE, AND LOW OR NO EMISSIONS PROGRAMS
APPLICATION PURPOSE: OPERATING COSTS FOR FY24 AND FY25; ACTIVITIES PERFORMED: ANNUAL COST OF CONTRACTING PREVENTATIVE MAINTENANCE AND PLANNING ACTIVITIES GRANT FOR XPRESS; EXPECTED OUTCOMES: REDUCED CONGESTION DURING PEAK HOURS RELIABLE TRANSIT FOR SHIFT WORKERS; INTENDED BENEFICIARIES: COMMUTERS AND SHIFT WORKERS IN THE ATLANTA REGION; SUBRECIPIENT ACTIVITIES: NONE
$13,287,714
FORMULA GRANT (A)
May 21, 2025
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
STATE OF GOOD REPAIR GRANTS PROGRAM
APPLICATION PURPOSE: OPERATING COSTS FOR FY24 AND FY25; ACTIVITIES PERFORMED: ANNUAL COST OF CONTRACTING PREVENTATIVE MAINTENANCE AND PLANNING ACTIVITIES GRANT FOR XPRESS; EXPECTED OUTCOMES: REDUCED CONGESTION DURING PEAK HOURS RELIABLE TRANSIT FOR SHIFT WORKERS; INTENDED BENEFICIARIES: COMMUTERS AND SHIFT WORKERS IN THE ATLANTA REGION; SUBRECIPIENT ACTIVITIES: NONE
$13,287,714
FORMULA GRANT (A)
May 21, 2025
Atlanta-Region Transit Link Authority
245 Peachtree Center Ave Ne
Department of Transportation / Federal Transit Administration
BUSES AND BUS FACILITIES FORMULA, COMPETITIVE, AND LOW OR NO EMISSIONS PROGRAMS
FY 21 XPRESS PROGRAM GRANT: PROJECTS INCLUDE FUNDS FOR XPRESS CAPITAL COST OF CONTRACTING PREVENTIVE MAINTENANCE THE REGIONAL VANPOOL PROGRAM AND REGIONAL MOBILITY MANAGEMENT.THIS GRANT APPLICATION REQUESTS FEDERAL FY18 FY19 5307 URBANIZED AREA FORMULA FUNDS IN THE AMOUNT OF $6794562 FEDERAL FY19 5337 HIGH INTENSITY MOTOR BUS FUNDS IN THE AMOUNT OF $1367190 AND FY18 AND FY 19 5339 BUS AND BUS FACILITIES FUNDS IN THE AMOUNT OF $1313508 APPORTIONED TO THE ATLANTA URBANIZED AREA SUB-ALLOCATED TO THE GEORGIA REGIONAL TRANSPORTATION AUTHORITY AND TRANSFERRED TO THE ATLANTA-REGION TRANSIT LINK AUTHORITY. AS PER PRIOR YEAR APPLICATIONS FARE REVENUES FROM THE VANPOOL SERVICE IN ALI 11.71.12 VANPOOL CAPITAL COST OF 3RD PARTY CONTRACTING ARE CODED AS TRANSPORTATION DEVELOPMENT CREDITS IN THE APPLICATION BUDGET. THE ELIGIBLE CAPITAL ASSISTANCE ACTIVITIES ARE OUTLINED IN THE PROJECT DETAILS OF THE APPLICATION; ATL DOES NOT ANTICIPATE PURCHASING ANY CAPITAL EQUIPMENT IN EXCESS OF $5000 USING THESE FUNDS.THE SOURCE OF LOCAL MATCH FUNDING FOR XPRESS RELATED ACTIVITIES ORIGINATES FROM STATE APPROPRIATIONS.
$9,475,260
FORMULA GRANT (A)
Dec 16, 2024
Showing 20 of 24 grants

Schools & Education

Part of Atlanta City School District. 3 nearby schools serving this area.

E
Elementary

Thomas Heathe Slater Elementary School

Score 16/100
Enrollment 570
Distance 0.3 mi
M
Middle

Judson Price Middle School

Score 16/100
Enrollment 303
Distance 0.3 mi
H
High School

Carver High School Early College

Enrollment 305
Distance 0.2 mi

Source: National Center for Education Statistics (NCES) · Updated Feb 2026

At a Glance

Avg Home Value
$1,119,537
Est. Monthly Cost
$6,127
$5,661 mortgage · N/A tax
Best School
16/100
3 nearby schools
Stability
Stable
55/100
1 homes · 1 street

Peachtree Center Ave exhibits moderate stability with a mix of long-term and newer residents.

Continue Your Research

Frequently Asked Questions

What is the average home value in Peachtree Center Ave?
The average assessed property value in Peachtree Center Ave is $1,119,537, with average annual property taxes of N/A.
What school district is Peachtree Center Ave in?
Peachtree Center Ave is served by Atlanta City School District. The highest-rated nearby school scores 16/100.
How many homes are in Peachtree Center Ave?
Peachtree Center Ave in Atlanta, GA has 1 homes across 1 street.
Is Peachtree Center Ave good for families?
Peachtree Center Ave is served by Atlanta City School District (top school score: 16/100), average home value of $1,119,537. The neighborhood has 1 homes across 1 street, providing a close-knit community for families.
How much does it cost to live in Peachtree Center Ave?
The average assessed home value is $1,119,537, and the estimated total monthly housing cost (mortgage, taxes, and insurance) is approximately $6,127. These estimates are based on a 30-year mortgage at 6.5% with 20% down.
What elementary school serves Peachtree Center Ave?
The nearest elementary school is Thomas Heathe Slater Elementary School, located 0.3 miles away. It has 570 students enrolled.
What high school serves Peachtree Center Ave?
The nearest high school is Carver High School Early College, located 0.2 miles away.
Is Peachtree Center Ave a stable neighborhood?
Peachtree Center Ave has a stability score of 55/100, classified as "Stable." This indicates moderate stability with some residential turnover.

Data Sources & Methodology

6 verified data sources power this report

Property tax & valuation records

Federal education statistics

Healthcare facility & outcome data

Transportation & hazard data

5-year community survey estimates

Housing market indicators

Last updated:

View full methodology

Get Neighborhood Updates

Stay informed about changes in Peachtree Center Ave.